Used genetic algorithm (GA) to optimize the network of ventilation in order toavoid artificial convergence and speed up the convergence rate to introduce the Powellalgorithm. The Powell algorithm had been integrated i...Used genetic algorithm (GA) to optimize the network of ventilation in order toavoid artificial convergence and speed up the convergence rate to introduce the Powellalgorithm. The Powell algorithm had been integrated into GA. Powell had the effectivecapacity of solving the local optimal solution. Powell and the cross as a method ofchoice, a variation of the parallel operator, can be a better solution to the prematureconvergence of the GA problem. The two methods will be improved to make it an effective combination of hybrid GA called hybrid genetic algorithm (HGA) for the introductionof mine ventilation network optimization and to be used to solve the problem of regulating mine optimization.展开更多
Coalbed methane(CBM) commercial development requires choosing the arrangement of the wells.This should be done by considering the corresponding input-output(investment-profit) efficiencies.Simulations were obtained fr...Coalbed methane(CBM) commercial development requires choosing the arrangement of the wells.This should be done by considering the corresponding input-output(investment-profit) efficiencies.Simulations were obtained from the computer modeling group(CMG) given the reservoir conditions of the Panzhuang block in the southern part of the Qinshui Basin.This is a demonstration region for CBM development located in Shanxi province of northern China.The sensitivity of gas production from a single vertical well to the primary reservoir parameters was estimated first.Then multi-well gas production from three different well patterns was simulated to estimate the most appropriate well spacing.Combining the investment requirements then gave investment-profit efficiencies for these well patterns.A data envelopment analysis(DEA) model was used to optimize the efficiency.The results show that the permeability,the reservoir pressure,and the gas content have an evident impact on single well gas production.The desorption time has little or no affect on production.The equilateral triangular well pattern(ETWP) in a 400 m well spacing is,for multi-well development,the optimal pattern.It has a better input-output ratio,a longer stable yield time,and provides for greater CBM recovery than does either the rectangular well pattern(RWP) or the five point well pattern(FPWP).展开更多
基金Supported by the National Natural Science Foundation of China(60772159)
文摘Used genetic algorithm (GA) to optimize the network of ventilation in order toavoid artificial convergence and speed up the convergence rate to introduce the Powellalgorithm. The Powell algorithm had been integrated into GA. Powell had the effectivecapacity of solving the local optimal solution. Powell and the cross as a method ofchoice, a variation of the parallel operator, can be a better solution to the prematureconvergence of the GA problem. The two methods will be improved to make it an effective combination of hybrid GA called hybrid genetic algorithm (HGA) for the introductionof mine ventilation network optimization and to be used to solve the problem of regulating mine optimization.
基金supported by the National Natural Science Foundation of China (No. 40972207)the National Science and Technology Major Projects (No. 2011ZX05034-005)the PAPD of Jiangsu Higher Education Institutions
文摘Coalbed methane(CBM) commercial development requires choosing the arrangement of the wells.This should be done by considering the corresponding input-output(investment-profit) efficiencies.Simulations were obtained from the computer modeling group(CMG) given the reservoir conditions of the Panzhuang block in the southern part of the Qinshui Basin.This is a demonstration region for CBM development located in Shanxi province of northern China.The sensitivity of gas production from a single vertical well to the primary reservoir parameters was estimated first.Then multi-well gas production from three different well patterns was simulated to estimate the most appropriate well spacing.Combining the investment requirements then gave investment-profit efficiencies for these well patterns.A data envelopment analysis(DEA) model was used to optimize the efficiency.The results show that the permeability,the reservoir pressure,and the gas content have an evident impact on single well gas production.The desorption time has little or no affect on production.The equilateral triangular well pattern(ETWP) in a 400 m well spacing is,for multi-well development,the optimal pattern.It has a better input-output ratio,a longer stable yield time,and provides for greater CBM recovery than does either the rectangular well pattern(RWP) or the five point well pattern(FPWP).