To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model...To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model mainly consists of two parts, the determination of initial configuration schemes according to user preference and the selection of the optimal scheme. The comprehensive evaluation index(CEI), which is acquired through the analytic hierarchy process(AHP) weight calculation method, is adopted as the evaluation criterion to rank the initial schemes. The optimal scheme is obtained according to the ranking results. The proposed model takes the diversity of different equipment parameters and investment cost into consideration and can give relatively suitable and economical suggestions for system configuration.Additionally, unlike Homer Pro, the proposed model considers the complementation of different renewable energy resources, and thus the rationality of the multi-energy DG system is improved compared with the single evaluation criterion method which only considers the total cost.展开更多
Wetland park is an important mode of wetland protection, meanwhile, construction of comprehensive index system has become the hotspot and keystone of the researches on Wetland Parks. Basing on different development st...Wetland park is an important mode of wetland protection, meanwhile, construction of comprehensive index system has become the hotspot and keystone of the researches on Wetland Parks. Basing on different development stages, this paper firstly divided the Wetland Parks into three categories, including the start-up stage, the development stage and the refinement stage. And then screened and identified the direction and keypoints of comprehensive evaluation for wetland parks in different development stages using expert scoring, questionnaire and analytic hierarchy process(AHP).展开更多
A problem of a hierarchy structure optimization is considered.Hierarchical structures arewidely used in the Analytic Hierarchy Process,conjoint analysis,and various other methods of multiplecriteria decision making.Th...A problem of a hierarchy structure optimization is considered.Hierarchical structures arewidely used in the Analytic Hierarchy Process,conjoint analysis,and various other methods of multiplecriteria decision making.The problem consists in finding a structure that needs a minimum number ofpair comparisons for a given total number of the alternatives.For an optimal hierarchy,the minimumefforts are needed for eliciting data and synthesizing the local preferences across the hierarchy to getthe global priorities or utilities.Special estimation techniques are developed and numerical simulationsperformed.Analytical and numerical results suggest optimal ways of priority evaluations for practicalmanagerial decisions in a complex environment.展开更多
基金The National Natural Science Foundation of China(No.51377021)the Science and Technology Project of State Grid Corporation of China(No.SGTJDK00DWJS1600014)
文摘To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model mainly consists of two parts, the determination of initial configuration schemes according to user preference and the selection of the optimal scheme. The comprehensive evaluation index(CEI), which is acquired through the analytic hierarchy process(AHP) weight calculation method, is adopted as the evaluation criterion to rank the initial schemes. The optimal scheme is obtained according to the ranking results. The proposed model takes the diversity of different equipment parameters and investment cost into consideration and can give relatively suitable and economical suggestions for system configuration.Additionally, unlike Homer Pro, the proposed model considers the complementation of different renewable energy resources, and thus the rationality of the multi-energy DG system is improved compared with the single evaluation criterion method which only considers the total cost.
基金National Natural Science Foundation(Project Number:41101080)Natural Science Foundation of Shandong Province(Project Number:ZR2014DQ028/ZR2015DM004)
文摘Wetland park is an important mode of wetland protection, meanwhile, construction of comprehensive index system has become the hotspot and keystone of the researches on Wetland Parks. Basing on different development stages, this paper firstly divided the Wetland Parks into three categories, including the start-up stage, the development stage and the refinement stage. And then screened and identified the direction and keypoints of comprehensive evaluation for wetland parks in different development stages using expert scoring, questionnaire and analytic hierarchy process(AHP).
文摘A problem of a hierarchy structure optimization is considered.Hierarchical structures arewidely used in the Analytic Hierarchy Process,conjoint analysis,and various other methods of multiplecriteria decision making.The problem consists in finding a structure that needs a minimum number ofpair comparisons for a given total number of the alternatives.For an optimal hierarchy,the minimumefforts are needed for eliciting data and synthesizing the local preferences across the hierarchy to getthe global priorities or utilities.Special estimation techniques are developed and numerical simulationsperformed.Analytical and numerical results suggest optimal ways of priority evaluations for practicalmanagerial decisions in a complex environment.