Decreased hedonic and motivational capacity,namely anhedonia,is one of the cardinal features for patients with major depressive disorder(MDD).Recent studies suggest that this reduced ability to experience pleasure i...Decreased hedonic and motivational capacity,namely anhedonia,is one of the cardinal features for patients with major depressive disorder(MDD).Recent studies suggest that this reduced ability to experience pleasure is also a marker or endophenotype for MDD and represents a genetic predisposition to this disorder.Dr.展开更多
The size and allocation method of transmission network loss have major impact on particular users involved with the electricity market trading process, therefore, the accuracy of scheduled network loss rates will be v...The size and allocation method of transmission network loss have major impact on particular users involved with the electricity market trading process, therefore, the accuracy of scheduled network loss rates will be vital to the economic concerns from the stakeholders. In view of the shortcoming of existing loss rate scheme in 1,000 kV demonstration project, three scheduled loss rates applied to the UHV AC (ultra high voltage alternating current) transaction settlement are revised. By taking relationship between loss rate and power into consideration, the new segmented correction scheme greatly reduces the deviation between scheduled loss rates and actual loss rates, and is more accurate, flexible and expansible than the old one.展开更多
文摘Decreased hedonic and motivational capacity,namely anhedonia,is one of the cardinal features for patients with major depressive disorder(MDD).Recent studies suggest that this reduced ability to experience pleasure is also a marker or endophenotype for MDD and represents a genetic predisposition to this disorder.Dr.
文摘The size and allocation method of transmission network loss have major impact on particular users involved with the electricity market trading process, therefore, the accuracy of scheduled network loss rates will be vital to the economic concerns from the stakeholders. In view of the shortcoming of existing loss rate scheme in 1,000 kV demonstration project, three scheduled loss rates applied to the UHV AC (ultra high voltage alternating current) transaction settlement are revised. By taking relationship between loss rate and power into consideration, the new segmented correction scheme greatly reduces the deviation between scheduled loss rates and actual loss rates, and is more accurate, flexible and expansible than the old one.