The construction industry in Botswana has been identified as an industry with many problems. Currently the Botswana government uses the design-bid-build process, using prequalification and awards to the lowest bidder ...The construction industry in Botswana has been identified as an industry with many problems. Currently the Botswana government uses the design-bid-build process, using prequalification and awards to the lowest bidder for construction services. The government can also use the design-build delivery system. The current delivery system uses an engineering group that delivers designs and construction, uses a procurement group to award the contract and contract modifications. However, the analysis for all actions is done by the engineering group. The model is very similar to the Corps of Engineers traditional processes in the United States. Construction performance (on time and no contract deviations) has not been good. The authors propose that the delivery system and the paradigm of direction, control and decision making by the engineering group causes risk to the project and results in poor contractor performance. The authors suggest making modifications in the process and to use the design-build process. The authors also propose to change the paradigm using best value PIPS/IMT concepts.展开更多
文摘The construction industry in Botswana has been identified as an industry with many problems. Currently the Botswana government uses the design-bid-build process, using prequalification and awards to the lowest bidder for construction services. The government can also use the design-build delivery system. The current delivery system uses an engineering group that delivers designs and construction, uses a procurement group to award the contract and contract modifications. However, the analysis for all actions is done by the engineering group. The model is very similar to the Corps of Engineers traditional processes in the United States. Construction performance (on time and no contract deviations) has not been good. The authors propose that the delivery system and the paradigm of direction, control and decision making by the engineering group causes risk to the project and results in poor contractor performance. The authors suggest making modifications in the process and to use the design-build process. The authors also propose to change the paradigm using best value PIPS/IMT concepts.