期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
经尿道前列腺电切术的围术期护理 被引量:10
1
作者 李秀明 《护理研究(上旬版)》 2008年第S2期52-53,共2页
关键词 膀胱冲洗 暂时性尿失禁 导尿管 前列腺窝 手术时间 冲洗速度 病人血压 排尿困难 肺部并发症 体位训
下载PDF
Integrity assurance of GNSS-based train integrated positioning system 被引量:6
2
作者 LIU Jiang TANG Tao +2 位作者 GAI BaiGen WANG Jian CHEN DeWang 《Science China(Technological Sciences)》 SCIE EI CAS 2011年第7期1779-1792,共14页
This paper presents a novel Autonomous Integrity Monitoring and Assurance (AIMA) scheme for integrity assurance of the GNSS-based train integrated positioning system. In this scheme, integrity assurance strategies a... This paper presents a novel Autonomous Integrity Monitoring and Assurance (AIMA) scheme for integrity assurance of the GNSS-based train integrated positioning system. In this scheme, integrity assurance strategies are combined with a three-stage hierarchical architecture, considering the coupling effects among sensor collection, sensor fusion and matching decision level in train integrated positioning. In sensor collecting stage, the AIMA scheme deals with sensor faults and failures with a PCA-based fault detection, diagnosis and isolation approach. In multi-sensor fusion stage, a novel cubature point H0o filter is presented to enhance the fault tolerance capability, and a hybrid approach is applied to indicating and monitoring the protection level of position estimation, concerning both the estimating covariance and measurement slopes. In map matching stage, hypothesis testing with specific test statistic is carried out to determine effectiveness of positioning results. Position calculation will be invalid with an alarm triggered if the specific integrity criterion is not satisfied in any stage. Since independent solutions are applied in AIMA, integrity assurance is closely coupled with information processing in train integrated positioning. Numerical results of the three cases correspond to the hierarchical architecture with field data and simulations are presented to illustrate features and applicability of the proposed AIMA scheme and specific solutions. 展开更多
关键词 train positioning integrated positioning GNSS integrity assurance
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部