Let B and H be finitely generated projective Hopf algebras over a commutative ring R, with B cocommutative and H commutative. In this paper we investigate cocleft extensions of Hopf algebras, and prove that the isomor...Let B and H be finitely generated projective Hopf algebras over a commutative ring R, with B cocommutative and H commutative. In this paper we investigate cocleft extensions of Hopf algebras, and prove that the isomorphism classes of cocleft Hopf algebras extensions of B by H are determined uniquely by the group C(B, H) = ZC(B, H)/d(B, H) .展开更多
The way of neutral point to earth via full compensation arc suppression coil can solve the problem of residual current compensation in coal mine power network effectively. Based on the analysis on the grounding curren...The way of neutral point to earth via full compensation arc suppression coil can solve the problem of residual current compensation in coal mine power network effectively. Based on the analysis on the grounding current detection results of Xieqiao coal mine, the conclusion that harmonic component of grounding current is dominated by higher harmonics with complex harmonic sources in coal mine power network system was obtained. The influences of harmonic source type and fault point position on harmonic voltage and harmonic current were analyzed theoretically. The influences of earthed fault feeder detection result and the estimation errors of parameters to earth on residual current compensation were analyzed. A new thought of residual current prediction and the selections of model method and control method were proposed on this basis. The simulation results prove that harmonic amplitudes of zero sequence voltage and zero sequence current are determined by harmonic source type as well as fault point position in coal mine power network, and also prove that zero sequence voltage detection can avoid the unstable problem of coal mine power network system caused by undercompensation of capacitive current. Finally, the experimental device of full compensation arc suppression coil is introduced.展开更多
基金the NSF of China(No.10571153)and the NSF(No.2004kj352) of Anhui ProvinceChina
文摘Let B and H be finitely generated projective Hopf algebras over a commutative ring R, with B cocommutative and H commutative. In this paper we investigate cocleft extensions of Hopf algebras, and prove that the isomorphism classes of cocleft Hopf algebras extensions of B by H are determined uniquely by the group C(B, H) = ZC(B, H)/d(B, H) .
基金The financial support from the National Natural Science Foundation of China (No. 51107143)
文摘The way of neutral point to earth via full compensation arc suppression coil can solve the problem of residual current compensation in coal mine power network effectively. Based on the analysis on the grounding current detection results of Xieqiao coal mine, the conclusion that harmonic component of grounding current is dominated by higher harmonics with complex harmonic sources in coal mine power network system was obtained. The influences of harmonic source type and fault point position on harmonic voltage and harmonic current were analyzed theoretically. The influences of earthed fault feeder detection result and the estimation errors of parameters to earth on residual current compensation were analyzed. A new thought of residual current prediction and the selections of model method and control method were proposed on this basis. The simulation results prove that harmonic amplitudes of zero sequence voltage and zero sequence current are determined by harmonic source type as well as fault point position in coal mine power network, and also prove that zero sequence voltage detection can avoid the unstable problem of coal mine power network system caused by undercompensation of capacitive current. Finally, the experimental device of full compensation arc suppression coil is introduced.