期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
X80管线钢用于国内输气管道工程 被引量:6
1
作者 孙巧 《油气田地面工程》 北大核心 2013年第6期130-130,共1页
我国于2004至2005年在西气东输冀宁联络线上对X80级管线钢(长7.9 km)进行了试验;西气东输二线工程设计输量300×108m3/a,全长近9 000 km,其中约4 000 km采用国产化X80钢管,占工程用钢总量的67%;已开工建设的西气东输三线工程也采用... 我国于2004至2005年在西气东输冀宁联络线上对X80级管线钢(长7.9 km)进行了试验;西气东输二线工程设计输量300×108m3/a,全长近9 000 km,其中约4 000 km采用国产化X80钢管,占工程用钢总量的67%;已开工建设的西气东输三线工程也采用了X80级钢管。迄今为止,西二线是全世界唯一采用X80高钢级、大口径、大壁厚钢管的天然气商用管道工程。 展开更多
关键词 西气东输工程 输气管道 X80级管材 供管能力
下载PDF
A Study on Preconditions Setting of Long-Term Contract between Manufacturer and Component Supplier
2
作者 Sidi Wu Hisashi Onari 《Journal of Mechanics Engineering and Automation》 2016年第1期9-18,共10页
To provide a risk-sharing mechanism that encourages a component supplier and a manufacturer to expand their production capacity of components and products, many researches on SCM suggested that it is better for the SC... To provide a risk-sharing mechanism that encourages a component supplier and a manufacturer to expand their production capacity of components and products, many researches on SCM suggested that it is better for the SC players to connect a long-term contract with flexible preconditions before doing the decision-making of production capacity. With considering of the uncertainty of demand and integrity problems between SC players, it is difficult to set reasonable preconditions. As a result, under-investment problems still occur frequently. In this paper, after we had discussed the decision-making of production capacity with the preconditions by analyzing the character of the players, we verified the under-investment problem of the supply chain. In order to clarify the optimum preconditions to alleviate the under-investment problem, we also analyzed the relations between preconditions and supply capacity of the whole supply chain. In the last part of this paper, we proposed a method of preconditions setting in such uncertain situations. 展开更多
关键词 Supply chain management production capacity CONTRACT under investment.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部