More effective environmental pollution control and management are needed due to the increasing environ-mental impacts from a range of human activities and the growing public demands for a better living environment. Ur...More effective environmental pollution control and management are needed due to the increasing environ-mental impacts from a range of human activities and the growing public demands for a better living environment. Urban air pollution is a serious environmental issue that poses adverse impacts on the health of people and the environment in most metropolitan areas. In this paper,we propose a geoinformatics augmented framework of environmental modelling and information sharing for supporting effective urban air pollution control and management. This framework is out-lined in terms of its key components and processes including: 1) an integrated,adaptive network of sensors for envi-ronmental monitoring; 2) a set of distributed,interoperable databases for data management; 3) a set of intelligent,robust algorithms and models for environmental modelling; 4) a set of flexible,efficient user interfaces for data access and in-formation sharing; and 5) a reliable,high capacity,high performance computing and communication infrastructure for integrating and supporting other framework components and processes.展开更多
BIM (building information modelling) has gained wider acceptance in the A/E/C (architecture/engineering/construction) industry in the US and internationally. This paper presents current industry approaches of impl...BIM (building information modelling) has gained wider acceptance in the A/E/C (architecture/engineering/construction) industry in the US and internationally. This paper presents current industry approaches of implementing 3D point cloud data in BIM and VDC (virtual design and construction) applications during various stages of a project life cycle and the challenges associated with processing the huge amount of 3D point cloud data. Conversion from discrete 3D point cloud raster data to geometric/vector BIM data remains to be a labor-intensive process. The needs for intelligent geometric feature detection/reconstruction algorithms for automated point cloud processing and issues related to data management are discussed. This paper also presents an innovative approach for integrating 3D point cloud data with BIM to efficiently augment built environment design, construction and management.展开更多
Based on the integrated predecessors' research results and practical experience at home and abroad, on the basis of investigation and study the Xinlong casting co., LTD. In the process of implementation of human reso...Based on the integrated predecessors' research results and practical experience at home and abroad, on the basis of investigation and study the Xinlong casting co., LTD. In the process of implementation of human resources information management problems, such as: The problems existing in the informatization recruitment; The problems in the compensation management, software foundation weak; In the labor relations problems. ChangIng the concept of executives, to renew the idea of human resources information management. And other small and medium-sized enterprise human resources the implementation of information management to provide the reference and the suggestion.展开更多
This research aimed to determine instruments for analysis of knowledge management in operators companies of metropolitan transport systems. How much the goal was an exploratory research, how much the procedure was a l...This research aimed to determine instruments for analysis of knowledge management in operators companies of metropolitan transport systems. How much the goal was an exploratory research, how much the procedure was a literature search, how much as nature was an applied research, and how much as approach was qualitative research? The following instruments were identified and selected: (a) the methodology for the analysis of metropolitan transport systems; (b) the knowledge management maturity model (Siemens); and (c) Documentation and Information Centre. The simulation, using the tools in the knowledge management to analyze the Company Metropolitan of S^io Paulo--METRO, identified the need for improvements in eight areas and the problems: (1) rethink the knowledge management area; (2) develop new knowledge management policies; (3) define responsibilities in knowledge management area; (4) implement new knowledge management processes; (5) explore new ways and structures of knowledge; (6) consider the internal and external actors in knowledge management actions; (7) expand the dissemination of the collaborative culture; and (8) integrate in the knowledge management area current and future initiatives. The analysis shows that the transposition of the current situation to the desired situation for the company can be obtained with the implementation of an Information and Documentation Centre. The conclusion is that this set of tools allows to characterize, evaluate, and model the knowledge management in this business.展开更多
The focus of the article is on the contribution of the perspective of supply chain management (SCM) to the explanation of internationalization processes. The empirical study is based on case studies of 20 small- and...The focus of the article is on the contribution of the perspective of supply chain management (SCM) to the explanation of internationalization processes. The empirical study is based on case studies of 20 small- and medium-sized enterprises (SMEs) with international activities from China, India, New Zealand, and Singapore. All chosen firms were founded after 1980 in order to capture retrospectively the whole globalization process of each firm. All sample firms operate their supply chains (SCs) on the basis of information and communications technology (ICT). Depending on size, strategy, business model, industry, and mindset of the managers, firms use ICT on a range from integrating individual functional areas to integrating the whole SC through enterprise resource planning (ERP) and customer relationship management (CRM) systems.展开更多
This paper describes the implementation of an Information Systems (IS) capstone project management course that is a requirement for graduating seniors in an undergraduate Computer Information Systems (CIS) program...This paper describes the implementation of an Information Systems (IS) capstone project management course that is a requirement for graduating seniors in an undergraduate Computer Information Systems (CIS) program at a regional university. The description provides a model which includes the culmination of students' academic training in an IS curriculum which is part of a Bachelor of Business Administration (BBA) program in an accredited college of business. The course requires an application of technical and business skills, as well as systems development and project management skills--while students are working on an actual IS project for an external sponsoring organization. Rationale for implementing this type of course includes the benefits it provides to the students, the project sponsors, and the IS department providing the course. Feedback from the course is used as integral part of the C1S curriculum assessment process used for accreditation purposes.展开更多
The paper combine cloud computing with knowledge management, and classify the knowledge management of enterprise information management system, finally the paper plan and design the overall architecture of enterprise ...The paper combine cloud computing with knowledge management, and classify the knowledge management of enterprise information management system, finally the paper plan and design the overall architecture of enterprise management information system. According to the model of cloud computing, establish the cloud computing platform based on the construction of cloud computing and virtualization technology, in order to achieve the overall architecture of the management information system of enterprise that migrate to the cloud computing enviromlaent. This paper mainly introduced in the cloud computing architecture of enterprise management information system under the environment of cloud computing and implementation of knowledge management system.展开更多
For managing product development process of industrial enterprise in effect, an ProA model was brought out on the basis of discussing relationship between activity and process. Product development activity decompositi...For managing product development process of industrial enterprise in effect, an ProA model was brought out on the basis of discussing relationship between activity and process. Product development activity decomposition scheme exist plenty of constraint. Activity information decomposition based on ProA can quantitative decompose activity information, eliminate useless, unnecessary, redundancy information, guarantee information decomposition balance and information quality.展开更多
文摘More effective environmental pollution control and management are needed due to the increasing environ-mental impacts from a range of human activities and the growing public demands for a better living environment. Urban air pollution is a serious environmental issue that poses adverse impacts on the health of people and the environment in most metropolitan areas. In this paper,we propose a geoinformatics augmented framework of environmental modelling and information sharing for supporting effective urban air pollution control and management. This framework is out-lined in terms of its key components and processes including: 1) an integrated,adaptive network of sensors for envi-ronmental monitoring; 2) a set of distributed,interoperable databases for data management; 3) a set of intelligent,robust algorithms and models for environmental modelling; 4) a set of flexible,efficient user interfaces for data access and in-formation sharing; and 5) a reliable,high capacity,high performance computing and communication infrastructure for integrating and supporting other framework components and processes.
文摘BIM (building information modelling) has gained wider acceptance in the A/E/C (architecture/engineering/construction) industry in the US and internationally. This paper presents current industry approaches of implementing 3D point cloud data in BIM and VDC (virtual design and construction) applications during various stages of a project life cycle and the challenges associated with processing the huge amount of 3D point cloud data. Conversion from discrete 3D point cloud raster data to geometric/vector BIM data remains to be a labor-intensive process. The needs for intelligent geometric feature detection/reconstruction algorithms for automated point cloud processing and issues related to data management are discussed. This paper also presents an innovative approach for integrating 3D point cloud data with BIM to efficiently augment built environment design, construction and management.
文摘Based on the integrated predecessors' research results and practical experience at home and abroad, on the basis of investigation and study the Xinlong casting co., LTD. In the process of implementation of human resources information management problems, such as: The problems existing in the informatization recruitment; The problems in the compensation management, software foundation weak; In the labor relations problems. ChangIng the concept of executives, to renew the idea of human resources information management. And other small and medium-sized enterprise human resources the implementation of information management to provide the reference and the suggestion.
文摘This research aimed to determine instruments for analysis of knowledge management in operators companies of metropolitan transport systems. How much the goal was an exploratory research, how much the procedure was a literature search, how much as nature was an applied research, and how much as approach was qualitative research? The following instruments were identified and selected: (a) the methodology for the analysis of metropolitan transport systems; (b) the knowledge management maturity model (Siemens); and (c) Documentation and Information Centre. The simulation, using the tools in the knowledge management to analyze the Company Metropolitan of S^io Paulo--METRO, identified the need for improvements in eight areas and the problems: (1) rethink the knowledge management area; (2) develop new knowledge management policies; (3) define responsibilities in knowledge management area; (4) implement new knowledge management processes; (5) explore new ways and structures of knowledge; (6) consider the internal and external actors in knowledge management actions; (7) expand the dissemination of the collaborative culture; and (8) integrate in the knowledge management area current and future initiatives. The analysis shows that the transposition of the current situation to the desired situation for the company can be obtained with the implementation of an Information and Documentation Centre. The conclusion is that this set of tools allows to characterize, evaluate, and model the knowledge management in this business.
文摘The focus of the article is on the contribution of the perspective of supply chain management (SCM) to the explanation of internationalization processes. The empirical study is based on case studies of 20 small- and medium-sized enterprises (SMEs) with international activities from China, India, New Zealand, and Singapore. All chosen firms were founded after 1980 in order to capture retrospectively the whole globalization process of each firm. All sample firms operate their supply chains (SCs) on the basis of information and communications technology (ICT). Depending on size, strategy, business model, industry, and mindset of the managers, firms use ICT on a range from integrating individual functional areas to integrating the whole SC through enterprise resource planning (ERP) and customer relationship management (CRM) systems.
文摘This paper describes the implementation of an Information Systems (IS) capstone project management course that is a requirement for graduating seniors in an undergraduate Computer Information Systems (CIS) program at a regional university. The description provides a model which includes the culmination of students' academic training in an IS curriculum which is part of a Bachelor of Business Administration (BBA) program in an accredited college of business. The course requires an application of technical and business skills, as well as systems development and project management skills--while students are working on an actual IS project for an external sponsoring organization. Rationale for implementing this type of course includes the benefits it provides to the students, the project sponsors, and the IS department providing the course. Feedback from the course is used as integral part of the C1S curriculum assessment process used for accreditation purposes.
文摘The paper combine cloud computing with knowledge management, and classify the knowledge management of enterprise information management system, finally the paper plan and design the overall architecture of enterprise management information system. According to the model of cloud computing, establish the cloud computing platform based on the construction of cloud computing and virtualization technology, in order to achieve the overall architecture of the management information system of enterprise that migrate to the cloud computing enviromlaent. This paper mainly introduced in the cloud computing architecture of enterprise management information system under the environment of cloud computing and implementation of knowledge management system.
文摘For managing product development process of industrial enterprise in effect, an ProA model was brought out on the basis of discussing relationship between activity and process. Product development activity decomposition scheme exist plenty of constraint. Activity information decomposition based on ProA can quantitative decompose activity information, eliminate useless, unnecessary, redundancy information, guarantee information decomposition balance and information quality.