A large number of towns along the Sanriku coastal line were swept away by tsunami attacks on March 11,2011. Although some heritage buildings survived, the damage condition was too severe to carry on repair and restore...A large number of towns along the Sanriku coastal line were swept away by tsunami attacks on March 11,2011. Although some heritage buildings survived, the damage condition was too severe to carry on repair and restore them to the owners. As the municipal cultural heritage division and local cultural society in Kesennuma City were looking for possibility to save these damaged heritage buildings, the author gave them full assistance. To apply for fund for the repair and restoration work to related foundations, the author made an investigation of the damage conditions, prepared measured drawings, fundamental restoration plans and cost estimates. Domestic and international foundations granted funds to our projects for three years in May 2012, and we formed a restoration body to take responsibility of repair and restoration work. But soon, we were faced with several difficulties. The first is that we had to wait for a long time until the authority fixed the town redevelopment plan, meeting the National Guideline of Tsunami-Free Redevelopment. The second is that the building cost continued to increase during rapid-development periods. Although the author expected to complete the whole work within three years, the progress is really slow, and has not amounted to a quarter.展开更多
Approaches to building renovation require high professional levels, interdisciplinary elements, team work and time to study and do research on the buildings. The process of renovating historic buildings is made up of ...Approaches to building renovation require high professional levels, interdisciplinary elements, team work and time to study and do research on the buildings. The process of renovating historic buildings is made up of agreements and compromises between the interests of the government, common interests, and the motives and interests of individual owners and prospective investors. Research that deals with any portion of cultural heritages always carried out very precisely, but there is still no precise knowledge of how to define a system and draw up a model that accurately represents a cultural heritage. In the existing literature on this topic, the authors have written about the different views of how to explain the construction project as a system. While many authors focus on "sub-phases" directly connected to the building of an object, the process involved in the construction phase often neglects the phases required before beginning work, which culminates in a logical sequence in the process of preparing a project. Irregularities or deficiencies which occur during the preparation process of a project often directly impact the construction itself. What the scope of this impact depends on the approach of the contractual organization, the organization of construction companies and on co-operation between the customer (or architects) and the contractors. Unlike the projects for newly built objects, the conservation projects of cultural heritage are not only more demanding because of lack of knowledge of the building materials, construction, foundation and interaction of the mentioned individual parts into a unit called a building. The authors analyzed the structural aspects of building conservation which were suggested by Beckmaun and Bowles and another methodology, which was developed as part of the 5th framework program for the purpose of providing a comprehensive and interdisciplinary treatment of the revitalization of a historical city. The authors found that both methodologies do not include modern IT tools and methods. By analyzing and monitoring the restoration of historic buildings in Slovenia, specifically in the city of Maribor (including all documentation, interviews and direct views) the authors found that the project was regarded as a collection of individual projects rather than a unified whole (a system). The authors have demonstrated the consequences of structuring a historic building restoration project in a non-systemic way. This type of project can be classified as a non-sustainable renovation. In this article, at first the authors will try to clarify what types of systems and subsystems are considered in renovating historic buildings. The authors show when and why a system becomes stochastic (a probability) and in the end what would be needed to successfully re-establish it back to a determined system. By analyzing the work and reconstruction of old buildings in Maribor, the authors found that it would be necessary to give a new framework with IT tools for the preparation of a historic building restoration project.展开更多
The Korea Water Resources Corporation (K-Water) has encountered four problems during the management of water resources of approximately 1,300 buildings spread throughout the country-degradation, budget constraints, ...The Korea Water Resources Corporation (K-Water) has encountered four problems during the management of water resources of approximately 1,300 buildings spread throughout the country-degradation, budget constraints, lack of standards, and lack of planning. In this study, we have developed a mechanism for collecting, maintaining, and analyzing ground data for repair and replacement works. Our BMS (building maintenance system) uses the recorded repair and replacement work histories and calculates the life cycle costs of the related items. Further, it enables the performance of repair and replacement tasks through an integrated approach aimed at preventive maintenance. In this manner, the BMS is expected to maximize the efficiency of the formulation of prevention and maintenance work plans, monitoring of work histories, predictions of future tasks from the analyses of repair and replacement histories, and performance of LCC (life cycle cost) calculations. Reliable maintenance of national properties can thus be achieved by using the BMS, which promotes reasonable and efficient repair and replacement activities.展开更多
文摘A large number of towns along the Sanriku coastal line were swept away by tsunami attacks on March 11,2011. Although some heritage buildings survived, the damage condition was too severe to carry on repair and restore them to the owners. As the municipal cultural heritage division and local cultural society in Kesennuma City were looking for possibility to save these damaged heritage buildings, the author gave them full assistance. To apply for fund for the repair and restoration work to related foundations, the author made an investigation of the damage conditions, prepared measured drawings, fundamental restoration plans and cost estimates. Domestic and international foundations granted funds to our projects for three years in May 2012, and we formed a restoration body to take responsibility of repair and restoration work. But soon, we were faced with several difficulties. The first is that we had to wait for a long time until the authority fixed the town redevelopment plan, meeting the National Guideline of Tsunami-Free Redevelopment. The second is that the building cost continued to increase during rapid-development periods. Although the author expected to complete the whole work within three years, the progress is really slow, and has not amounted to a quarter.
文摘Approaches to building renovation require high professional levels, interdisciplinary elements, team work and time to study and do research on the buildings. The process of renovating historic buildings is made up of agreements and compromises between the interests of the government, common interests, and the motives and interests of individual owners and prospective investors. Research that deals with any portion of cultural heritages always carried out very precisely, but there is still no precise knowledge of how to define a system and draw up a model that accurately represents a cultural heritage. In the existing literature on this topic, the authors have written about the different views of how to explain the construction project as a system. While many authors focus on "sub-phases" directly connected to the building of an object, the process involved in the construction phase often neglects the phases required before beginning work, which culminates in a logical sequence in the process of preparing a project. Irregularities or deficiencies which occur during the preparation process of a project often directly impact the construction itself. What the scope of this impact depends on the approach of the contractual organization, the organization of construction companies and on co-operation between the customer (or architects) and the contractors. Unlike the projects for newly built objects, the conservation projects of cultural heritage are not only more demanding because of lack of knowledge of the building materials, construction, foundation and interaction of the mentioned individual parts into a unit called a building. The authors analyzed the structural aspects of building conservation which were suggested by Beckmaun and Bowles and another methodology, which was developed as part of the 5th framework program for the purpose of providing a comprehensive and interdisciplinary treatment of the revitalization of a historical city. The authors found that both methodologies do not include modern IT tools and methods. By analyzing and monitoring the restoration of historic buildings in Slovenia, specifically in the city of Maribor (including all documentation, interviews and direct views) the authors found that the project was regarded as a collection of individual projects rather than a unified whole (a system). The authors have demonstrated the consequences of structuring a historic building restoration project in a non-systemic way. This type of project can be classified as a non-sustainable renovation. In this article, at first the authors will try to clarify what types of systems and subsystems are considered in renovating historic buildings. The authors show when and why a system becomes stochastic (a probability) and in the end what would be needed to successfully re-establish it back to a determined system. By analyzing the work and reconstruction of old buildings in Maribor, the authors found that it would be necessary to give a new framework with IT tools for the preparation of a historic building restoration project.
文摘The Korea Water Resources Corporation (K-Water) has encountered four problems during the management of water resources of approximately 1,300 buildings spread throughout the country-degradation, budget constraints, lack of standards, and lack of planning. In this study, we have developed a mechanism for collecting, maintaining, and analyzing ground data for repair and replacement works. Our BMS (building maintenance system) uses the recorded repair and replacement work histories and calculates the life cycle costs of the related items. Further, it enables the performance of repair and replacement tasks through an integrated approach aimed at preventive maintenance. In this manner, the BMS is expected to maximize the efficiency of the formulation of prevention and maintenance work plans, monitoring of work histories, predictions of future tasks from the analyses of repair and replacement histories, and performance of LCC (life cycle cost) calculations. Reliable maintenance of national properties can thus be achieved by using the BMS, which promotes reasonable and efficient repair and replacement activities.