As the share of photovoltaic power generation in power system has increased year by year, the optimization choice of access system schemes become one of the first and most important problems in grid before admitting p...As the share of photovoltaic power generation in power system has increased year by year, the optimization choice of access system schemes become one of the first and most important problems in grid before admitting photovoltaic power generation. Therefore, this article takes a proposed distributed photovoltaic as an example to research and analyze two kinds of high density multiple access points distributed photovoltaic access system schemes. The emphasis is making a comprehensive comparison and selection among the aspect of active power loss and economic benefit, etc. In the premise of ensuring the normal power generation of the photovoltaic system, it puts forward the recommended scheme that can help to spontaneous self-consumption, elimination on the spot, effectively decrease network loss and economic benefit.展开更多
The paper presents the design and field test of a distributed solar PV system for industrial application (DGPVi). DGPVi utilizes HyPV (hybrid PV) system which generates solar power for self-consumption in lighting...The paper presents the design and field test of a distributed solar PV system for industrial application (DGPVi). DGPVi utilizes HyPV (hybrid PV) system which generates solar power for self-consumption in lighting and air conditioning in a production line of a factory when solar energy is available. It does not feed the excess PV power to the grid. HyPV will be switched to grid power supply when solar energy is not available. A 3 kWp DGPVi is installed in a factory for field demonstration. The test results show that the solar PV power generated can be utilized immediately. The solar energy generation efficiency (kWh/day per kWp PV installation) of DGPVi is close to that of grid-tied PV system without self-consumption and battery storage. The yearly return on investment of DGPVi is 2.0% at the present installation cost or 3.3% at further cost-down cost. The payback time will be 14.3 years at the present installation cost or 12.1 years at cost-down cost. The present study verifies the economic feasibility of DGPVi.展开更多
文摘As the share of photovoltaic power generation in power system has increased year by year, the optimization choice of access system schemes become one of the first and most important problems in grid before admitting photovoltaic power generation. Therefore, this article takes a proposed distributed photovoltaic as an example to research and analyze two kinds of high density multiple access points distributed photovoltaic access system schemes. The emphasis is making a comprehensive comparison and selection among the aspect of active power loss and economic benefit, etc. In the premise of ensuring the normal power generation of the photovoltaic system, it puts forward the recommended scheme that can help to spontaneous self-consumption, elimination on the spot, effectively decrease network loss and economic benefit.
文摘The paper presents the design and field test of a distributed solar PV system for industrial application (DGPVi). DGPVi utilizes HyPV (hybrid PV) system which generates solar power for self-consumption in lighting and air conditioning in a production line of a factory when solar energy is available. It does not feed the excess PV power to the grid. HyPV will be switched to grid power supply when solar energy is not available. A 3 kWp DGPVi is installed in a factory for field demonstration. The test results show that the solar PV power generated can be utilized immediately. The solar energy generation efficiency (kWh/day per kWp PV installation) of DGPVi is close to that of grid-tied PV system without self-consumption and battery storage. The yearly return on investment of DGPVi is 2.0% at the present installation cost or 3.3% at further cost-down cost. The payback time will be 14.3 years at the present installation cost or 12.1 years at cost-down cost. The present study verifies the economic feasibility of DGPVi.