Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system b...Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system based on multiple time scales.On the basis of the analysis of the uncertainty of wind power and PV power as well as the characteristics of load side resource dispatching,the optimal model of coordinating and dispatching“source-load”in power system based on multiple time scales is established.It can simultaneously and effectively dispatch conventional generators,wind plant,PV power station,pumped-storage power station and load side resources by optimally using three time scales:day-ahead,intra-day and real-time.According to the latest predicted information of wind power,PV power and load,the original generation schedule can be rolled and amended by using the corresponding time scale.The effectiveness of the model can be verified by a real system.The simulation results show that the proposed model can make full use of“source-load”resources to improve the ability to consume wind power and PV power of the grid-connected system.展开更多
Afghanistan has a tremendous resource potential of renewable energy especially solar and the wind. Therefore, utilization of these resources has a special rule for the remote areas where access to the electrical grid ...Afghanistan has a tremendous resource potential of renewable energy especially solar and the wind. Therefore, utilization of these resources has a special rule for the remote areas where access to the electrical grid or secure power supply is a dream for most of the people. This paper presents a feasibility and usefulness of hybrid power generation based on PV/wind/diesel generator for an off-grid rural village that feeds the load at a rate of average 7.9 kWh/day with 1.32 kW peak load. GsT (geospatial toolkit) is used to obtain the solar and wind data of the site. Windographer software is used to analyze the wind resource data of the site. HOMER Pro software package is used to select the suitable and reliable hybrid generation system and calculate the optimal capacities and costs of the components. Through the study, it is found that this state of the art adaptation could provide vast opportunities for off-grid rural communities such as in Afghanistan where enough high penetration of renewable energy is available.展开更多
After years of booming growth on renewable energy, the untapped land suitable for the wind farm becomes increasingly scarce in China. In order to make full use of the land, it became a realistic practice to construct ...After years of booming growth on renewable energy, the untapped land suitable for the wind farm becomes increasingly scarce in China. In order to make full use of the land, it became a realistic practice to construct wind farm together with PV station in those areas where both the wind resource and solar resource are rich. In this paper, based on the analysis of spatial distribution characteristics of wind and solar resources, the factors influencing on the layout of wind turbine and PV array and the interaction between wind turbine and PV array, a proposal for co-siting design wind farm and PV station is discussed.展开更多
The impact of large-scale grid-connected renewable power sources, such as wind generators and solar photovoitaic systems, on transient stability of synchronous generators is discussed in this paper. The permanent magn...The impact of large-scale grid-connected renewable power sources, such as wind generators and solar photovoitaic systems, on transient stability of synchronous generators is discussed in this paper. The permanent magnet synchronous generator with variable speed wind turbine is used in the simulation analysis as a wind generator model. The transient stability analysis is performed for IEEE 9-bus system model with high-penetration renewable power sources. The effect of FRT (fault ride-through) capability implemented for each power source on the transient stability is investigated.展开更多
基金Major Projects of Gansu Province(No.17ZD2GA010)Power Company Technology Projects of State Grid Corporation in Gansu Province(No.52272716000K)
文摘Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system based on multiple time scales.On the basis of the analysis of the uncertainty of wind power and PV power as well as the characteristics of load side resource dispatching,the optimal model of coordinating and dispatching“source-load”in power system based on multiple time scales is established.It can simultaneously and effectively dispatch conventional generators,wind plant,PV power station,pumped-storage power station and load side resources by optimally using three time scales:day-ahead,intra-day and real-time.According to the latest predicted information of wind power,PV power and load,the original generation schedule can be rolled and amended by using the corresponding time scale.The effectiveness of the model can be verified by a real system.The simulation results show that the proposed model can make full use of“source-load”resources to improve the ability to consume wind power and PV power of the grid-connected system.
文摘Afghanistan has a tremendous resource potential of renewable energy especially solar and the wind. Therefore, utilization of these resources has a special rule for the remote areas where access to the electrical grid or secure power supply is a dream for most of the people. This paper presents a feasibility and usefulness of hybrid power generation based on PV/wind/diesel generator for an off-grid rural village that feeds the load at a rate of average 7.9 kWh/day with 1.32 kW peak load. GsT (geospatial toolkit) is used to obtain the solar and wind data of the site. Windographer software is used to analyze the wind resource data of the site. HOMER Pro software package is used to select the suitable and reliable hybrid generation system and calculate the optimal capacities and costs of the components. Through the study, it is found that this state of the art adaptation could provide vast opportunities for off-grid rural communities such as in Afghanistan where enough high penetration of renewable energy is available.
文摘After years of booming growth on renewable energy, the untapped land suitable for the wind farm becomes increasingly scarce in China. In order to make full use of the land, it became a realistic practice to construct wind farm together with PV station in those areas where both the wind resource and solar resource are rich. In this paper, based on the analysis of spatial distribution characteristics of wind and solar resources, the factors influencing on the layout of wind turbine and PV array and the interaction between wind turbine and PV array, a proposal for co-siting design wind farm and PV station is discussed.
文摘The impact of large-scale grid-connected renewable power sources, such as wind generators and solar photovoitaic systems, on transient stability of synchronous generators is discussed in this paper. The permanent magnet synchronous generator with variable speed wind turbine is used in the simulation analysis as a wind generator model. The transient stability analysis is performed for IEEE 9-bus system model with high-penetration renewable power sources. The effect of FRT (fault ride-through) capability implemented for each power source on the transient stability is investigated.