水平岩层大断面隧道光面爆破施工技术 被引量:2
1
作者 穆君 《山西建筑》 2010年第14期315-316,共2页
结合现场实际施工情况,介绍如何解决水平岩层大断面隧道施工中光爆开挖超欠的问题,以及如何提高长大隧道的掘进速度,提出了"岩变我变"的思想,提高光爆效果。
关键词 水平岩层 长大隧道 光爆开挖 超欠挖 掘进速度
下载PDF
Precision blasting excavation of rock face beam in underground hydropower station under complex geological conditions 被引量:1
2
作者 Li Changneng Xu Chengguang 《Engineering Sciences》 EI 2014年第6期46-51,共6页
To deal with the construction difficulties of Xiangjiaba underground hydropower station,such as complex geological conditions,narrow rock bench,high loading,high quality requirements and urgent time limit,the project ... To deal with the construction difficulties of Xiangjiaba underground hydropower station,such as complex geological conditions,narrow rock bench,high loading,high quality requirements and urgent time limit,the project adopted the concept of precision blasting.The explosive energy and rock mass fragmentation were well controlled by taking reasonable excavation sequence,designing steel pipe drilling frame,the additional techniques of double layer smooth blasting,evenly micro charge,staggered arrangement of boreholes and pre-stressed anchors.These technologies ensured the excavation quality of the rock face beam,achieving successful blasting results:Semi hole ratio was 100%in Ⅱ surrounding rock,99.2%in Ⅲ surrounding rock and 90%~ 97.3%in Ⅳ surrounding rock;underbreak was avoided and the average backbreak was only2.9 cm;the unevenness was 0 ~ 4 cm;the influence depth of blasting and unloading was 0.2 ~ 0.7 cm. 展开更多
关键词 Xiangjiaba hydropower station underground workshop rock face beam precision blasting exca- vation