一、概述鹤岗矿务局富力煤矿在皮带机头峒室采用光爆锚喷支护获得成功。富力矿是鹤岗局唯一年生产设计能力108万 t 的皮带井,地面标高+251m,现井下准备水平-310。该峒室宽9.85m、高7.7m、长19.6m。它处在-110标高,是皮带二段折返机头峒...一、概述鹤岗矿务局富力煤矿在皮带机头峒室采用光爆锚喷支护获得成功。富力矿是鹤岗局唯一年生产设计能力108万 t 的皮带井,地面标高+251m,现井下准备水平-310。该峒室宽9.85m、高7.7m、长19.6m。它处在-110标高,是皮带二段折返机头峒室,安装钢丝绳皮带的驱动装置,今后为-110以下运煤系统服务,服务年限60年。展开更多
Eccentric decoupling blasting is commonly used in underground excavation.Determination of perimeter hole parameters(such as the blasthole diameter,spacing,and burden)based on an eccentric charge structure is vital for...Eccentric decoupling blasting is commonly used in underground excavation.Determination of perimeter hole parameters(such as the blasthole diameter,spacing,and burden)based on an eccentric charge structure is vital for achieving an excellent smooth blasting effect.In this paper,the Riedel-Hiermaier-Thoma(RHT)model was employed to study rock mass damage under smooth blasting.Firstly,the parameters of the RHT model were calibrated by using the existing SHPB experiment,which were then verified by the existing blasting experiment results.Secondly,the influence of different charge structures on the blasting effect was investigated using the RHT model.The simulation results indicated that eccentric charge blasting has an obvious pressure eccentricity effect.Finally,to improve the blasting effect,the smooth blasting parameters were optimized based on an eccentric charge structure.The overbreak and underbreak phenomena were effectively controlled,and a good blasting effect was achieved with the optimized blasting parameters.展开更多
The quality of contour blasting depends on many initial blasting parameters.The parameters including blasthole diameter,rock Protodyakonov coefficient,tunnel area and distance between cracks on the tunnel face are mor...The quality of contour blasting depends on many initial blasting parameters.The parameters including blasthole diameter,rock Protodyakonov coefficient,tunnel area and distance between cracks on the tunnel face are more important.In this study,an algorithm linking between Delphi programming language and AutoCAD was created to develop a tunnel blasting model.Using this model,tunnel contour blasting passport in AutoCAD can be obtained automatically.The effects of rock Protodyakonov coefficient and cracks’distance on blastholes number and specific charge with the variation of blasthole diameter and the semi-circular tunnel face area were investigated to yield a set of equations with the highest correlations.The results show that specific charge increases as rock Protodyakonov coefficient,cracks’distance and drillhole diameter increase,but decreases when tunnel face area increases.In addition,the number of drillholes increases linearly as tunnel face area increases but decreases when drillhole diameter increases.展开更多
The dynamic stress-fields and their distribution characteristics around boreholes in the directed crack blasting were measured with the dynamic photo-elastic laser holography apparatus and the ultradymamic measurement...The dynamic stress-fields and their distribution characteristics around boreholes in the directed crack blasting were measured with the dynamic photo-elastic laser holography apparatus and the ultradymamic measurement system. The directed crack mechanism and its mechanical model have been analysed and expounded. Through the 43 production experiments using slotted cartridges and the double triangle center cut-holes for directed crack blasting in underground rock drift, the results of which the rates of half-hole marks and efficiency of borehole,and the nonsmooth grades of the cut contours are 96%, 98% and 10cm respectively have been achieved.展开更多
To deal with the construction difficulties of Xiangjiaba underground hydropower station,such as complex geological conditions,narrow rock bench,high loading,high quality requirements and urgent time limit,the project ...To deal with the construction difficulties of Xiangjiaba underground hydropower station,such as complex geological conditions,narrow rock bench,high loading,high quality requirements and urgent time limit,the project adopted the concept of precision blasting.The explosive energy and rock mass fragmentation were well controlled by taking reasonable excavation sequence,designing steel pipe drilling frame,the additional techniques of double layer smooth blasting,evenly micro charge,staggered arrangement of boreholes and pre-stressed anchors.These technologies ensured the excavation quality of the rock face beam,achieving successful blasting results:Semi hole ratio was 100%in Ⅱ surrounding rock,99.2%in Ⅲ surrounding rock and 90%~ 97.3%in Ⅳ surrounding rock;underbreak was avoided and the average backbreak was only2.9 cm;the unevenness was 0 ~ 4 cm;the influence depth of blasting and unloading was 0.2 ~ 0.7 cm.展开更多
文摘一、概述鹤岗矿务局富力煤矿在皮带机头峒室采用光爆锚喷支护获得成功。富力矿是鹤岗局唯一年生产设计能力108万 t 的皮带井,地面标高+251m,现井下准备水平-310。该峒室宽9.85m、高7.7m、长19.6m。它处在-110标高,是皮带二段折返机头峒室,安装钢丝绳皮带的驱动装置,今后为-110以下运煤系统服务,服务年限60年。
基金Projects(11802058,52074262)supported by the National Natural Science Foundation of ChinaProjects(BK20170670,BK20180651)supported by the Jiangsu Youth Foundation,China+2 种基金Project(2020QN06)supported by the Fundamental Research Funds for the Central Universities,ChinaProject(SKLGDUEK1803)supported by the State Key Laboratory for Geomechanics and Deep Underground Engineering,ChinaProject supported by the Mass Entrepreneurship and Innovation Project of Jiangsu,China。
文摘Eccentric decoupling blasting is commonly used in underground excavation.Determination of perimeter hole parameters(such as the blasthole diameter,spacing,and burden)based on an eccentric charge structure is vital for achieving an excellent smooth blasting effect.In this paper,the Riedel-Hiermaier-Thoma(RHT)model was employed to study rock mass damage under smooth blasting.Firstly,the parameters of the RHT model were calibrated by using the existing SHPB experiment,which were then verified by the existing blasting experiment results.Secondly,the influence of different charge structures on the blasting effect was investigated using the RHT model.The simulation results indicated that eccentric charge blasting has an obvious pressure eccentricity effect.Finally,to improve the blasting effect,the smooth blasting parameters were optimized based on an eccentric charge structure.The overbreak and underbreak phenomena were effectively controlled,and a good blasting effect was achieved with the optimized blasting parameters.
文摘The quality of contour blasting depends on many initial blasting parameters.The parameters including blasthole diameter,rock Protodyakonov coefficient,tunnel area and distance between cracks on the tunnel face are more important.In this study,an algorithm linking between Delphi programming language and AutoCAD was created to develop a tunnel blasting model.Using this model,tunnel contour blasting passport in AutoCAD can be obtained automatically.The effects of rock Protodyakonov coefficient and cracks’distance on blastholes number and specific charge with the variation of blasthole diameter and the semi-circular tunnel face area were investigated to yield a set of equations with the highest correlations.The results show that specific charge increases as rock Protodyakonov coefficient,cracks’distance and drillhole diameter increase,but decreases when tunnel face area increases.In addition,the number of drillholes increases linearly as tunnel face area increases but decreases when drillhole diameter increases.
文摘The dynamic stress-fields and their distribution characteristics around boreholes in the directed crack blasting were measured with the dynamic photo-elastic laser holography apparatus and the ultradymamic measurement system. The directed crack mechanism and its mechanical model have been analysed and expounded. Through the 43 production experiments using slotted cartridges and the double triangle center cut-holes for directed crack blasting in underground rock drift, the results of which the rates of half-hole marks and efficiency of borehole,and the nonsmooth grades of the cut contours are 96%, 98% and 10cm respectively have been achieved.
文摘To deal with the construction difficulties of Xiangjiaba underground hydropower station,such as complex geological conditions,narrow rock bench,high loading,high quality requirements and urgent time limit,the project adopted the concept of precision blasting.The explosive energy and rock mass fragmentation were well controlled by taking reasonable excavation sequence,designing steel pipe drilling frame,the additional techniques of double layer smooth blasting,evenly micro charge,staggered arrangement of boreholes and pre-stressed anchors.These technologies ensured the excavation quality of the rock face beam,achieving successful blasting results:Semi hole ratio was 100%in Ⅱ surrounding rock,99.2%in Ⅲ surrounding rock and 90%~ 97.3%in Ⅳ surrounding rock;underbreak was avoided and the average backbreak was only2.9 cm;the unevenness was 0 ~ 4 cm;the influence depth of blasting and unloading was 0.2 ~ 0.7 cm.