期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
高中数学开放题的求解策略
1
作者 王茵 《数学学习与研究》 2010年第23期60-60,共1页
数学开放题,由于它的条件不完备或结论有侍探求,故思维难度较大,不少学生为找不到解决这类问题的方法而苦恼.本文阐述了寻求矛盾、充要条件的推导、特殊化、分类讨论以及逐步逼近五类解决开放题的策略.
关键词 开放题 入口宽 解法活 分类辨析讨论
下载PDF
Research on the width of filling body in gob-side entry retaining with high-water materials 被引量:10
2
作者 Chang Qingliang Tang Weijun +1 位作者 Xu Ying Zhou Huaqiang 《International Journal of Mining Science and Technology》 EI CSCD 2018年第3期519-524,共6页
To determine the filling body's width along the gob-side remained roadway which is underneath the gob,the authors analyzed the interaction mechanism between the roof and the supporting body along the remained road... To determine the filling body's width along the gob-side remained roadway which is underneath the gob,the authors analyzed the interaction mechanism between the roof and the supporting body along the remained roadway, based on the elastic thin plate theory of the stope roof. The stress state and mechanical response of the filling body along the remained roadway were studied. Specifically, firstly, the supporting pressure of the coal pillar which is on one side of the gob-side remained roadway was deduced.Also, an equation that is used to calculate the width of the balance area in the stress limit state was acquired. Then, an equation that is used to calculate the roof cutting force on one side of the supporting body was obtained. By using FLAC3D, the authors investigated the displacement field and stress field response laws of rock masses around the roadway with different filling body's widths. The results show that with the filling body's width increasing, the supporting ability of the filling body increases.Meanwhile, the rock mass displacement around the roadway and the filling body deformation decrease.The better the filling body's supporting effect is, the higher the roof cutting force will be. When the filling body's width is larger than 3.0 m, its internal bearing ability becomes stable and the filling body's deformation became non-apparent. Finally, analysis shows that the filling body's width should be 2.5 m.Furthermore, the authors conducted field tests in the supply roadway 1204, using high-water materials and acquired expected outcomes. 展开更多
关键词 Gob-side entry retaining High-water materials Numerical simulation Support along the roadway
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部