Xinli district of Sanshandao Gold Mine is the first subsea metal mine in China.To achieve 6 kt/d production capacity under the premise of safe mining,high-intensity mining might destroy the in-situ stress filed and th...Xinli district of Sanshandao Gold Mine is the first subsea metal mine in China.To achieve 6 kt/d production capacity under the premise of safe mining,high-intensity mining might destroy the in-situ stress filed and the stability of rockmass.According to sampling and testing of ore-rock and backfill and in-situ stress field measurement,safety factor method calculation model based on stress-strain strength reduction at arbitrary points and Mohr-Coulomb yield criterion was established and limit displacement subsidence values under the safety factor of different limit stoping steps were calculated.The results from three years in-situ mining and strata movement monitoring using multi-point displacements meter showed that the lower settlement frame stope hierarchical level filling mining method,mining sequence are reasonable and rockmass stability evaluation using safety factor method,in-situ real-time monitoring can provide the technical foundation for the safety of seabed mining.展开更多
Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equi...Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equilibrium method. The calculation results present that the safety factors of pillars in Sections 19, 20, 24, 28 are less than 1.3, and those of unstable sections are identified preliminarily. Further, a numerical investigation in Sections 18, 20, 22, 24, 25 and 28 implemented with numerical code RFPA20 is employed to further validate the pillar performance and the stability of stopes. The numerical results show the pillars in Sections 18, 22 and 24 are stable and the designed pillar size is suitable. The width of the ore body near Section 28 averages 20 m, failure occurs in the left stope, but the boundary pillars near Section 28 maintain good performance. The pillars in Sections 20 and 25 are unstable which are mainly affected by the Faults F8 and F18. The existence of faults alters the stress distribution, failure mode and water inrush pathway. This work provides a meaningful standard for boundary pillar and stope design in a mine as it transitions from an open pit to underground.展开更多
基金Project(10872218) supported by the National Natural Science Foundation of ChinaProject(2010CB732004) supported by the National Key Basic Research Program of China+1 种基金Project(20090461022) supported by the National Postdoctoral Foundation of ChinaProject (11MX21) supported by the Students' Innovation Project Aubsidize Award of Arcelor Mittal
文摘Xinli district of Sanshandao Gold Mine is the first subsea metal mine in China.To achieve 6 kt/d production capacity under the premise of safe mining,high-intensity mining might destroy the in-situ stress filed and the stability of rockmass.According to sampling and testing of ore-rock and backfill and in-situ stress field measurement,safety factor method calculation model based on stress-strain strength reduction at arbitrary points and Mohr-Coulomb yield criterion was established and limit displacement subsidence values under the safety factor of different limit stoping steps were calculated.The results from three years in-situ mining and strata movement monitoring using multi-point displacements meter showed that the lower settlement frame stope hierarchical level filling mining method,mining sequence are reasonable and rockmass stability evaluation using safety factor method,in-situ real-time monitoring can provide the technical foundation for the safety of seabed mining.
基金Projects(1004025,51174044,50934006)supported by the National Natural Science FoundationProject(2011AA060400)supported by the National High Technique Research and Development Program of ChinaProject(Sklgduek1113)supported by Funds of the State Key Laboratory for Geomechanics&Deep Underground Engineering,Chinese University of Mining and Technology,China
文摘Based on the height of back-filled materials, thickness of ore body, height of boundary pillar and dipping angle of ore body and water pressure, the safety factors of all the pillars are calculated with the limit equilibrium method. The calculation results present that the safety factors of pillars in Sections 19, 20, 24, 28 are less than 1.3, and those of unstable sections are identified preliminarily. Further, a numerical investigation in Sections 18, 20, 22, 24, 25 and 28 implemented with numerical code RFPA20 is employed to further validate the pillar performance and the stability of stopes. The numerical results show the pillars in Sections 18, 22 and 24 are stable and the designed pillar size is suitable. The width of the ore body near Section 28 averages 20 m, failure occurs in the left stope, but the boundary pillars near Section 28 maintain good performance. The pillars in Sections 20 and 25 are unstable which are mainly affected by the Faults F8 and F18. The existence of faults alters the stress distribution, failure mode and water inrush pathway. This work provides a meaningful standard for boundary pillar and stope design in a mine as it transitions from an open pit to underground.