我国煤矿岩巷安全高效掘进技术现状与展望 被引量:169
1
作者 杨仁树 《煤炭科学技术》 CAS 北大核心 2013年第9期18-23,共6页
为找出我国岩巷掘进技术差距,结合我国煤矿岩巷掘进的现状,总结性地回顾了我国岩巷掘进技术发展历程,着重分析了岩巷掘进中钻爆法和综掘法施工工艺的存在的问题,调查显示我国岩巷掘进存在"两大两低"的特点,进尺平均仅为80 m/... 为找出我国岩巷掘进技术差距,结合我国煤矿岩巷掘进的现状,总结性地回顾了我国岩巷掘进技术发展历程,着重分析了岩巷掘进中钻爆法和综掘法施工工艺的存在的问题,调查显示我国岩巷掘进存在"两大两低"的特点,进尺平均仅为80 m/月,正规循环率仅为75%,最后指出我国岩巷安全高效掘进发展方向:钻爆法方面基于新型液压钻车的深部大断面巷道深孔爆破配套技术及装备研究,辅以大断面巷道精细爆破及周边定向断裂控制爆破机理研究和控制爆破药卷的推广应用;综掘法方面基于深孔预裂松动爆破的全岩掘进机掘进工艺研究,综掘机的自动化和遥控化研究和全断面硬岩掘进机(TBM)适应性研究。 展开更多
关键词 岩巷掘进 钻爆法 综掘法 全岩掘进机 深孔爆破
下载PDF
Optimal design for buckets layout based on muck removal analysis of TBM cutterhead 被引量:4
2
作者 YANG Mei XIA Yi-min +2 位作者 LIN Lai-kuang QIAO Shuo JI Zhi-yong 《Journal of Central South University》 SCIE EI CAS CSCD 2020年第6期1729-1741,共13页
The layout of the buckets for tunnel boring machine(TBM)directly affects the muck removal efficiency of cutterhead during excavation.In order to improve the muck removal performance for TBM,the optimal design of bucke... The layout of the buckets for tunnel boring machine(TBM)directly affects the muck removal efficiency of cutterhead during excavation.In order to improve the muck removal performance for TBM,the optimal design of bucket layout was investigated.The whole muck transfer process was simulated by discrete-element method(DEM),including the muck falling,colliding,pilling up,shoveling and transferring into the hopper.The muck model was established based on size distribution analysis of muck samples from the water-supply tunnel project in Jilin Province,China.Then,the influence of the bucket number and the interval angle between buckets on muck removal performance was investigated.The results indicated that,as the number of buckets increased from four to eight,the removed muck increased by 29%and the residual volume decreased by 40.5%,and the process became steadier.Different interval angles between buckets were corresponding to different removed muck irregularly,but the residual muck number increased generally with the angles.The optimal layout of buckets for the cutterhead in this tunnel project was obtained based on the simulation results,and the muck removal performance of the TBM was verified by the actual data in the engineering construction. 展开更多
关键词 optimal design buckets layout discrete element method muck removal performance tunnel boring machine