期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
成品油贸易交接过程计量全程监测系统
1
《科技开发动态》 2004年第8期64-64,共1页
关键词 成品油贸易 计量 全程监测系统 现场测量传感器、ADAM模块 数据采集
原文传递
酱油生产中全程质量监测管理系统的建立
2
作者 曹景华 《中国调味品》 CAS 北大核心 2000年第9期29-29,28,共2页
阐述半成品检验在酱油生产中的重要性 ,提出了建立全程质量监测管理系统的必要性。本系统的建立将产品细分化 ,使每个班组、每个人都有章可依 ,便于车间管理 ,同时将产生不合格产品的因素 ,消灭在生产过程中 ,保证产品质量。
关键词 全程质量监测管理系统 酱油 产品质量
下载PDF
Dynamic Deformation Monitoring for Long-Span Bridges under Construction and EMD De-noising Method
3
作者 Shengxiang Huang Chao Kang Wen Zhang 《Journal of Civil Engineering and Architecture》 2016年第7期853-859,共7页
Construction progress of long-span bridge is complicated and the quality control is strict. Any disadvantage during construction may potentially affect the internal forces and deck alignments after it is open to traff... Construction progress of long-span bridge is complicated and the quality control is strict. Any disadvantage during construction may potentially affect the internal forces and deck alignments after it is open to traffic. To exactly evaluate the periodic alignments, internal forces and safety, geometrical and physical monitoring are needed during construction. This study aims at the requirement of dynamic geometric monitoring during Sutong Bridge construction, and introduces the realization and observing schemes of the self-developed GPS real-time dynamic geometrical deformation monitoring system. Affected by wind load and construction circumstance, GPS (global positioning system) monitoring signal contains a variety of noise. And the useful signal can be extracted from the signal after de-noising the noises. A de-noising method based on EMD (empirical mode decomposition) model is introduced here to process the bridge dynamic monitoring data, and with the wavelet threshold de-noising method are compared. The result shows that the EMD method has good adaptability, is free from the choice of wavelet bases and the number of decomposition layer. The method is an effective de-noising method for dynamic deformation monitoring to large-span bridges. 展开更多
关键词 Long-span bridge construction period dynamic deformation monitoring empirical mode decomposition de-noising.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部