期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
The research of breakdown structure and coding system for construction project
1
作者 丁大勇 金维兴 李培 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2004年第4期428-432,共5页
Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similariti... Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similarities and differences of two kinds of decomposing methods classified by type of work and construction elements based on the discussion of international typical coding standards system designing. We then deduce the differential coefficient relation between project breakdown structure (PBS) and work breakdown structure (WBS). At the same time we constitute a comprehensive construction project breakdown system including element code and type of work code and make a further schematic presentation of the implementation of the system’s functions. 展开更多
关键词 建设工程 破坏结构 全面断裂系统 编码系统
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部