This paper aims at widespread presence of expansive soil which can be obtained in the project from Xiaoxita to Yaqueling first-class highway rebuilding engineering in Yichang City of Hubei Province and weathered sand ...This paper aims at widespread presence of expansive soil which can be obtained in the project from Xiaoxita to Yaqueling first-class highway rebuilding engineering in Yichang City of Hubei Province and weathered sand which can be made full use locally,many experiments have been made. Compaction experiments and expansibility index indoor experiments of undisturbed expansive soil and expansive soil mixed with sand ranging from 10 % to 50 % have been made. Through the test mixing undisturbed expansive soil with different content of weathered sand,it can change the expansive soil water characteristics and compaction characteristics. It can influence the expansibility of the expansive soil index and significantly inhibit the expansibility of the expansive soil and reach the standard of roadbed filler.展开更多
In this paper, highway-related human activities are defined as well as the human activities related to highway for keeping a normal production and livelihood. They include highway research, highway education, highway ...In this paper, highway-related human activities are defined as well as the human activities related to highway for keeping a normal production and livelihood. They include highway research, highway education, highway legislation, administration of justice of highway case and enforce the law, assessment, planning, design, construction and management, decision-making of highway projects. Therefore, highway-related human activities are not equal to construction of highway projects.展开更多
The paper presents examples of technological designs for concrete placement in road bridges constructed during the S5/S 10 expressway extension in Poland. The project included eight concrete or composite bridge struct...The paper presents examples of technological designs for concrete placement in road bridges constructed during the S5/S 10 expressway extension in Poland. The project included eight concrete or composite bridge structures with different numbers of decks. The concrete placement technology is presented for the following bridge decks: slabs cast-in-situ, composite with precast or VFT (prefabricated composite beam) beams and mixed with cast in situ slabs and VFT-WIB (filler beam) beams. Continuous concrete placement was adopted for almost all the bridge superstructures except the mixed-type decks where construction joints were necessary. To control shrinkage, formwork deformations and existing restraints, the concrete was poured in layers and in stages. The design pace of concrete placement was moderate to be regulated at site without compromising safety and quality. The placement methods enabled both efficient and safe concrete pours.展开更多
Based on the theory of system dynamics, the paper analyzes the mechanism of socio-economic benefits of highway projects and establishes the system dynamics model of regional economic-highway development. Then taking J...Based on the theory of system dynamics, the paper analyzes the mechanism of socio-economic benefits of highway projects and establishes the system dynamics model of regional economic-highway development. Then taking Jinji(Tianjin--Jixian) Highway of Tianjin as an example, the errors of system simulation are tested, and the system dynamics model built is verified to be quite stable, which has a high performance. Through the comparison of simulation results with and without Jinji Highway, the paper simulates and predicts the socio-economie benefit of each year from 2003 to 2013. Thus the quantification evaluation of socio-economic benefit of highway project is realized and will provide the theory instructions for similar projects in the future.展开更多
文摘This paper aims at widespread presence of expansive soil which can be obtained in the project from Xiaoxita to Yaqueling first-class highway rebuilding engineering in Yichang City of Hubei Province and weathered sand which can be made full use locally,many experiments have been made. Compaction experiments and expansibility index indoor experiments of undisturbed expansive soil and expansive soil mixed with sand ranging from 10 % to 50 % have been made. Through the test mixing undisturbed expansive soil with different content of weathered sand,it can change the expansive soil water characteristics and compaction characteristics. It can influence the expansibility of the expansive soil index and significantly inhibit the expansibility of the expansive soil and reach the standard of roadbed filler.
基金Acknowledgement: This project was financially supported by Hunan Provincial Natural Science Foundation of China (No. 09JJ6065) and Engineering Research Center of Road Disaster Prevention and Transportation Safety of Ministry of Education (No. k0080306).
文摘In this paper, highway-related human activities are defined as well as the human activities related to highway for keeping a normal production and livelihood. They include highway research, highway education, highway legislation, administration of justice of highway case and enforce the law, assessment, planning, design, construction and management, decision-making of highway projects. Therefore, highway-related human activities are not equal to construction of highway projects.
文摘The paper presents examples of technological designs for concrete placement in road bridges constructed during the S5/S 10 expressway extension in Poland. The project included eight concrete or composite bridge structures with different numbers of decks. The concrete placement technology is presented for the following bridge decks: slabs cast-in-situ, composite with precast or VFT (prefabricated composite beam) beams and mixed with cast in situ slabs and VFT-WIB (filler beam) beams. Continuous concrete placement was adopted for almost all the bridge superstructures except the mixed-type decks where construction joints were necessary. To control shrinkage, formwork deformations and existing restraints, the concrete was poured in layers and in stages. The design pace of concrete placement was moderate to be regulated at site without compromising safety and quality. The placement methods enabled both efficient and safe concrete pours.
基金Technology Plan Projects of Tianjin Planning Bureau(No.2010H3-0011)
文摘Based on the theory of system dynamics, the paper analyzes the mechanism of socio-economic benefits of highway projects and establishes the system dynamics model of regional economic-highway development. Then taking Jinji(Tianjin--Jixian) Highway of Tianjin as an example, the errors of system simulation are tested, and the system dynamics model built is verified to be quite stable, which has a high performance. Through the comparison of simulation results with and without Jinji Highway, the paper simulates and predicts the socio-economie benefit of each year from 2003 to 2013. Thus the quantification evaluation of socio-economic benefit of highway project is realized and will provide the theory instructions for similar projects in the future.