Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined...Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined with the geological conditions and unplanned construction. Therefore, effective design and construction management should be conducted for ensuring a successful construction without damage and risk. In light of the reality of high slope construction along highway in the Huangshan area, this paper proposes a technical procedure for dynamic design and construction management of high slopes along highway in the mountainous area. The proposed construction management scheme is divided into three phases, i.e., 1) design phase, 2) preparation phase of excavation, and 3) construction phase. During the design phase, experiences and lessons learnt from the design and construction of other high slopes along highway in the same region are summarized. The number of slopes and slope height should be optimized from the aspects of route selection and route form. During the preparation phase of excavation, "Excavation Permit Management System" should be adopted, and construction scheme should be made by the construction unit, then the scientific research and design unit determine whether it guarantees slope stability and makes optimization measures. During the construction phase, the scientific research unit would make proposal of optimization design, and apply the achievements of scientific research into practice through common efforts of various units based on the understanding of excavation and investigation. The management system mentioned above is adopted to conduct dynamic design and construction management for more than 90 slopes along the Huangshan - Taling - Taolin Expressway, and successful results of application have been achieved.展开更多
We constructed a single C-Bezier curve with a shape parameter for G^2 joining two circular arcs. It was shown that an S-shaped transition curve, which is able to manage a broader scope about two circle radii than the ...We constructed a single C-Bezier curve with a shape parameter for G^2 joining two circular arcs. It was shown that an S-shaped transition curve, which is able to manage a broader scope about two circle radii than the Bezier curves, has no curvature extrema, while a C-shaped transition curve has a single curvature extremum. Regarding the two kinds of curves, specific algorithms were presented in detail, strict mathematical proofs were given, and the effectiveness of the method was shown by examples This method has the following three advantages: (1) the pattern is unified; (2) the parameter able to adjust the shape of the transition curve is available; (3) the transition curve is only a single segment, and the algorithm can be formulated as a low order equation to be solved for its positive root. These advantages make the method simple and easy to implement.展开更多
文摘Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined with the geological conditions and unplanned construction. Therefore, effective design and construction management should be conducted for ensuring a successful construction without damage and risk. In light of the reality of high slope construction along highway in the Huangshan area, this paper proposes a technical procedure for dynamic design and construction management of high slopes along highway in the mountainous area. The proposed construction management scheme is divided into three phases, i.e., 1) design phase, 2) preparation phase of excavation, and 3) construction phase. During the design phase, experiences and lessons learnt from the design and construction of other high slopes along highway in the same region are summarized. The number of slopes and slope height should be optimized from the aspects of route selection and route form. During the preparation phase of excavation, "Excavation Permit Management System" should be adopted, and construction scheme should be made by the construction unit, then the scientific research and design unit determine whether it guarantees slope stability and makes optimization measures. During the construction phase, the scientific research unit would make proposal of optimization design, and apply the achievements of scientific research into practice through common efforts of various units based on the understanding of excavation and investigation. The management system mentioned above is adopted to conduct dynamic design and construction management for more than 90 slopes along the Huangshan - Taling - Taolin Expressway, and successful results of application have been achieved.
基金supported by the National Natural Science Foundation ofChina (No. 60673031)the National Basic Research Program(973) of China (No. 2004CB719400)
文摘We constructed a single C-Bezier curve with a shape parameter for G^2 joining two circular arcs. It was shown that an S-shaped transition curve, which is able to manage a broader scope about two circle radii than the Bezier curves, has no curvature extrema, while a C-shaped transition curve has a single curvature extremum. Regarding the two kinds of curves, specific algorithms were presented in detail, strict mathematical proofs were given, and the effectiveness of the method was shown by examples This method has the following three advantages: (1) the pattern is unified; (2) the parameter able to adjust the shape of the transition curve is available; (3) the transition curve is only a single segment, and the algorithm can be formulated as a low order equation to be solved for its positive root. These advantages make the method simple and easy to implement.