Topology changes (reconfigurations) in the transmission system are effective remedial actions to restore fulfilling N-I security principle. In the transmission system, Slovak Republic prepares several scenarios of p...Topology changes (reconfigurations) in the transmission system are effective remedial actions to restore fulfilling N-I security principle. In the transmission system, Slovak Republic prepares several scenarios of possible reconfigurations, especially in the substation Varin and substation Lemesany. The paper describes reasons of reconfiguration necessity, preparation process, testing process, test results and comparison with expected results from simulation calculations. The conclusion summarizes advantages and disadvantages of the reconfiguration implementation in the transmission system, recommendations for real-time operation, including coordination with neighbouring transmission system operators and affected distribution system operators.展开更多
文摘Topology changes (reconfigurations) in the transmission system are effective remedial actions to restore fulfilling N-I security principle. In the transmission system, Slovak Republic prepares several scenarios of possible reconfigurations, especially in the substation Varin and substation Lemesany. The paper describes reasons of reconfiguration necessity, preparation process, testing process, test results and comparison with expected results from simulation calculations. The conclusion summarizes advantages and disadvantages of the reconfiguration implementation in the transmission system, recommendations for real-time operation, including coordination with neighbouring transmission system operators and affected distribution system operators.