Since the complex impeller structure and the difficult remanufacturing process may easily cause advance remanufacturing or excessive use,an optimized design method of impeller and service mapping model was presented f...Since the complex impeller structure and the difficult remanufacturing process may easily cause advance remanufacturing or excessive use,an optimized design method of impeller and service mapping model was presented for its proactive remanufacturing with setting up to explore the best remanufacturing time point in this work.Considering a certain model of long distance pipeline compressor impeller with the Basquin equation and the design method of impeller,the mathematical relationship between the changes of structure and life of the impeller was established.And the service mapping model between the structure and life was set up and simulated by ANSYS software.Thus,the service mapping model was applied to feedback the original design for proactive remanufacturing.In this work,the best proactive remanufacturing time point of impeller was analyzed with the service mapping model,and the structural parameter values could be optimized at this time point.Meanwhile,in the results of this simulation,it proves that the impeller under this optimization performance could satisfy the impeller operating demands.Therefore,comparing with the traditional optimization design method,the remanufacturing optimized design based on the service mapping model is feasible in proactive remanufacturing for sustainable development.展开更多
The remanufacturing system is remolding the manufacturing industry by bringing scrapped products back to such a condition that reintegrated performance is just as good as new.The remanufacturing environment is feature...The remanufacturing system is remolding the manufacturing industry by bringing scrapped products back to such a condition that reintegrated performance is just as good as new.The remanufacturing environment is featured by a far deeper level of uncertainty than new manufacturing,such as probabilistic routing files,and highly variable processing time.The stochastic disturbances result in the production bottlenecks,which constrain the productivity of the job shop.The uncertainties in the remanufacturing process cause the bottlenecks to shift when the workshop is processing.Considering this outstanding problem,many researchers try to optimize the production process to mitigate dynamic bottlenecks toward a balanced state.This paper proposes a data-driven method to predict bottlenecks in the remanufacturing system with multi-variant uncertainties.Firstly,discrete event simulation technology is applied to establish a simulation model of the remanufacturing production line and calculate the bottleneck index to identify bottlenecks.Secondly,a data-driven method,auto-regressive moving average(ARMA)model is employed to predict the bottlenecks in the system based on real-time data captured by the Arena software.Finally,the proposed prediction method is verified on real data from the automobile engine remanufacturing production line.展开更多
In order to evaluate recycle economy of end-of-life vehicles quantitatively,an economy model based on a recycle model of end-of-life vehicles and recycle cost analysis. With a practical example of recycling engines of...In order to evaluate recycle economy of end-of-life vehicles quantitatively,an economy model based on a recycle model of end-of-life vehicles and recycle cost analysis. With a practical example of recycling engines of end-of-life vehicles ,the validity of the recycle economy model and good recycle economy of the end-of-life vehicle engine were justified. It is concluded that ① remanufacture-ability of the part or component of the vehicles; ② the organization and management level of a recycle corporation; ③ policies and regulations of the government are crucial factors to raise the recycle economy of the end-of-life vehicle.展开更多
In order to evaluate and integrate travel time reliability and capacity reliability of a road network subjected to ice and snowfall conditions,the conceptions of travel time reliability and capacity reliability were d...In order to evaluate and integrate travel time reliability and capacity reliability of a road network subjected to ice and snowfall conditions,the conceptions of travel time reliability and capacity reliability were defined under special conditions.The link travel time model(ice and snowfall based-bureau public road,ISB-BPR) and the path choice decision model(elastic demand user equilibrium,EDUE) were proposed.The integrated reliability was defined and the model was set up.Monte Carlo simulation was used to calculate the model and a numerical example was provided to demonstrate the application of the model and efficiency of the solution algorithm.The results show that the intensity of ice and snowfall,the traffic demand and supply,and the requirements for level of service(LOS) have great influence on the reliability of a road network.For example,the reliability drops from 65% to 5% when the traffic demand increases by 30%.The comprehensive performance index may be used for network planning,design and maintenance.展开更多
基金Project(2011CB013406)supported by National Basic Research Program of ChinaProjects(51305119,51375133)supported by National Natural Science Foundation of China
文摘Since the complex impeller structure and the difficult remanufacturing process may easily cause advance remanufacturing or excessive use,an optimized design method of impeller and service mapping model was presented for its proactive remanufacturing with setting up to explore the best remanufacturing time point in this work.Considering a certain model of long distance pipeline compressor impeller with the Basquin equation and the design method of impeller,the mathematical relationship between the changes of structure and life of the impeller was established.And the service mapping model between the structure and life was set up and simulated by ANSYS software.Thus,the service mapping model was applied to feedback the original design for proactive remanufacturing.In this work,the best proactive remanufacturing time point of impeller was analyzed with the service mapping model,and the structural parameter values could be optimized at this time point.Meanwhile,in the results of this simulation,it proves that the impeller under this optimization performance could satisfy the impeller operating demands.Therefore,comparing with the traditional optimization design method,the remanufacturing optimized design based on the service mapping model is feasible in proactive remanufacturing for sustainable development.
基金Projects(51975099,51775086)supported by the Natural Science Foundation of China。
文摘The remanufacturing system is remolding the manufacturing industry by bringing scrapped products back to such a condition that reintegrated performance is just as good as new.The remanufacturing environment is featured by a far deeper level of uncertainty than new manufacturing,such as probabilistic routing files,and highly variable processing time.The stochastic disturbances result in the production bottlenecks,which constrain the productivity of the job shop.The uncertainties in the remanufacturing process cause the bottlenecks to shift when the workshop is processing.Considering this outstanding problem,many researchers try to optimize the production process to mitigate dynamic bottlenecks toward a balanced state.This paper proposes a data-driven method to predict bottlenecks in the remanufacturing system with multi-variant uncertainties.Firstly,discrete event simulation technology is applied to establish a simulation model of the remanufacturing production line and calculate the bottleneck index to identify bottlenecks.Secondly,a data-driven method,auto-regressive moving average(ARMA)model is employed to predict the bottlenecks in the system based on real-time data captured by the Arena software.Finally,the proposed prediction method is verified on real data from the automobile engine remanufacturing production line.
基金National Natural Science Foundation ofChina(No.50235030)
文摘In order to evaluate recycle economy of end-of-life vehicles quantitatively,an economy model based on a recycle model of end-of-life vehicles and recycle cost analysis. With a practical example of recycling engines of end-of-life vehicles ,the validity of the recycle economy model and good recycle economy of the end-of-life vehicle engine were justified. It is concluded that ① remanufacture-ability of the part or component of the vehicles; ② the organization and management level of a recycle corporation; ③ policies and regulations of the government are crucial factors to raise the recycle economy of the end-of-life vehicle.
基金Project(E200940) supported by the Natural Science Foundation of Heilongjiang Province, ChinaProject(2009GC20008020) supported by the Technology Research and Development Program of Shandong Province, China
文摘In order to evaluate and integrate travel time reliability and capacity reliability of a road network subjected to ice and snowfall conditions,the conceptions of travel time reliability and capacity reliability were defined under special conditions.The link travel time model(ice and snowfall based-bureau public road,ISB-BPR) and the path choice decision model(elastic demand user equilibrium,EDUE) were proposed.The integrated reliability was defined and the model was set up.Monte Carlo simulation was used to calculate the model and a numerical example was provided to demonstrate the application of the model and efficiency of the solution algorithm.The results show that the intensity of ice and snowfall,the traffic demand and supply,and the requirements for level of service(LOS) have great influence on the reliability of a road network.For example,the reliability drops from 65% to 5% when the traffic demand increases by 30%.The comprehensive performance index may be used for network planning,design and maintenance.