期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
地下采动条件下的农灌站机电技术改造——记新集二矿河西电灌站机电技术改造工程
1
作者 钟鸣远 孟辉 包正明 《煤炭工程》 北大核心 2002年第8期34-36,共3页
分析地下采动沉降作用对农灌站机电设施的破坏形式和破坏原因 ,根据设施的结构特点和使用特点 ,采取标高补偿、结构补强、应力释放等技术方法 ,对农灌站机电设施进行技术改造 ,以保证其安全运行。
关键词 沉降破坏 农灌站 机电设施 技术改造 地下采动 破坏形式
下载PDF
Analysis of Electricity Cost of Agricultural Irrigation and Drainage in Experiment Station 被引量:1
2
作者 张天策 尹庆珍 《Agricultural Science & Technology》 CAS 2017年第12期2617-2621,共5页
The electricity cost of agricultural irrigation and drainage in the Dahe Ex- periment Station was analyzed. The results showed that from 2012 to 2016, the annual total power and total electricity cost increased year b... The electricity cost of agricultural irrigation and drainage in the Dahe Ex- periment Station was analyzed. The results showed that from 2012 to 2016, the annual total power and total electricity cost increased year by year. The higher the electricity consumption was, the lower the factor adjusted power price was. The an- nual factor adjusted power price decreased from 532.5 yuan (above the national standard) to -599.78 yuan (below the national standard). The electricity consumption was always highest in June. The more the rainfall from June to September was, the less the monthly electricity usage was. The collect electricity charge to total electricity charge ratio was 1.26%-1.34%, the directory electricity charge to total electricity charge ratio was 96.34%-99.80%, and the electricity loss of transformer was 288-496 kW/h. 展开更多
关键词 Experiment station Agricultural irrigation and drainage Factor adjustedpower price ANALYSIS
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部