GPS measurement,an effective method for surveying glacier surface topography,has been applied in some glaciers for many years.The Shuiguan River No.4 glacier,a small glacier with its area of 1.84 km2 in 1972,located i...GPS measurement,an effective method for surveying glacier surface topography,has been applied in some glaciers for many years.The Shuiguan River No.4 glacier,a small glacier with its area of 1.84 km2 in 1972,located in the east of the Qilian Mountains,China,was selected to study its ice elevation change using GPS measurement in 2007.This study was conducted on the ablation area with GPS-measured area 0.5 km2.The ice elevation change of the glacier was obtained by comparing the DEM obtained by a 1:50 000 topographic map made in 1972 with the DEM by GPS-measured data acquired in 2007.The differences of the two DEMs showed the thinning condition of the glacier was apparent.The mean thinning was 15±8 m with the mean thinning rate of 0.42±0.22 m a-1 for 1972-2007 in the measurement area,which equaled 0.38±0.20 m yr-1 in water equivalent(w.e.).The prominent thinning occurred on the south part of the glacier,which was the area near the glacier terminus with the maximum thinning of 41±8 m.Assuming the thinning value of 15±8 m for the glacier area below 4640 m a.s.l.,the wasting ice mass was calculated to be 6.4±3.2×10-3 km3 for 1972-2007,corresponding to 5.7±2.8×10-3 km3 w.e.,which meant that the montane runoff released by the glacier was at least 5.7±2.8×106 m3 between 1972-2007.展开更多
Zelongnong Ravine,a branch ravine of Brahmaputra,is an old large glacier debris-flow ravine.Debris-flows with medium and/or small scales occur almost every year;multiple super debris-flows have also broken out in hist...Zelongnong Ravine,a branch ravine of Brahmaputra,is an old large glacier debris-flow ravine.Debris-flows with medium and/or small scales occur almost every year;multiple super debris-flows have also broken out in history,and have caused destructive disaster to local residents at the mouth of ravine and blocked Brahmaputra.The huge altitude difference and the steep slope of the Zelongnong Ravine provide predominant energy conditions for the debris-flow.The drainage basin is located in the fast uplifted area,where the complicated geologic structure,the cracked rock,and the frequent earthquake make the rocks experience strong weathering,thus plenty of granular materials are available for the formation of debris-flows.Although this region is located in the rain shadow area,the precipitation is concentrated and most is with high intensity.Also,the strong glacier activity provides water source for debris-flow.According to literature reviews,most debris-flows in the ravine are induced by rainstorms,and their scales are relatively small.However,when the melted water is overlaid,the large scale debris-flows may occur.Parametric calculation such as the flow velocity and the runoff is conducted according to the monitoring data.The result shows that large debris-flows can be aroused when the rainstorm and the melted water are combined well,but the possibility of blocking off Brahmaputra is rare.The occurrence of the super debris-flows is closely related to the intense glacier activity(e.g.,glaciersurge).They often result in destructive disasters and are hard to be prevented and cured by engineering measures,due to the oversized scales.The hazard mitigation measures such as monitoring and prediction are proposed.展开更多
基金supported by the National Basic Work Program of Chinese Ministry of Science and Technology (Grant No.2006FY110200)the Knowledge Innovation Program of the Chinese Academy of Sciences (Grant No.KZCX2-YW-GJ04)
文摘GPS measurement,an effective method for surveying glacier surface topography,has been applied in some glaciers for many years.The Shuiguan River No.4 glacier,a small glacier with its area of 1.84 km2 in 1972,located in the east of the Qilian Mountains,China,was selected to study its ice elevation change using GPS measurement in 2007.This study was conducted on the ablation area with GPS-measured area 0.5 km2.The ice elevation change of the glacier was obtained by comparing the DEM obtained by a 1:50 000 topographic map made in 1972 with the DEM by GPS-measured data acquired in 2007.The differences of the two DEMs showed the thinning condition of the glacier was apparent.The mean thinning was 15±8 m with the mean thinning rate of 0.42±0.22 m a-1 for 1972-2007 in the measurement area,which equaled 0.38±0.20 m yr-1 in water equivalent(w.e.).The prominent thinning occurred on the south part of the glacier,which was the area near the glacier terminus with the maximum thinning of 41±8 m.Assuming the thinning value of 15±8 m for the glacier area below 4640 m a.s.l.,the wasting ice mass was calculated to be 6.4±3.2×10-3 km3 for 1972-2007,corresponding to 5.7±2.8×10-3 km3 w.e.,which meant that the montane runoff released by the glacier was at least 5.7±2.8×106 m3 between 1972-2007.
基金supported by the National Natural Science Foundation of China(Grant No.40871024 & 40971014)
文摘Zelongnong Ravine,a branch ravine of Brahmaputra,is an old large glacier debris-flow ravine.Debris-flows with medium and/or small scales occur almost every year;multiple super debris-flows have also broken out in history,and have caused destructive disaster to local residents at the mouth of ravine and blocked Brahmaputra.The huge altitude difference and the steep slope of the Zelongnong Ravine provide predominant energy conditions for the debris-flow.The drainage basin is located in the fast uplifted area,where the complicated geologic structure,the cracked rock,and the frequent earthquake make the rocks experience strong weathering,thus plenty of granular materials are available for the formation of debris-flows.Although this region is located in the rain shadow area,the precipitation is concentrated and most is with high intensity.Also,the strong glacier activity provides water source for debris-flow.According to literature reviews,most debris-flows in the ravine are induced by rainstorms,and their scales are relatively small.However,when the melted water is overlaid,the large scale debris-flows may occur.Parametric calculation such as the flow velocity and the runoff is conducted according to the monitoring data.The result shows that large debris-flows can be aroused when the rainstorm and the melted water are combined well,but the possibility of blocking off Brahmaputra is rare.The occurrence of the super debris-flows is closely related to the intense glacier activity(e.g.,glaciersurge).They often result in destructive disasters and are hard to be prevented and cured by engineering measures,due to the oversized scales.The hazard mitigation measures such as monitoring and prediction are proposed.