Several conflicting objectives are considered in decision-making. MCDA (multi-criteria decision analysis) methods are developed to facilitate better decision making by decision-makers. Water supply problems are comp...Several conflicting objectives are considered in decision-making. MCDA (multi-criteria decision analysis) methods are developed to facilitate better decision making by decision-makers. Water supply problems are complex problems with multiple decision making and criteria. Hence, the use of multi-criteria decision analysis is very appropriate for solving these problems. Multi-criteria decision analysis can be divided into three main groups: value measurement models, goals, aspiration and reference level models and outranking models. The methods listed have been applied to water supply problems, especially in the evaluation of alternative water supply strategies. Each method has its advantages and limitations. A good alternative for concluding a better-suited method for water supply problems is to apply more than one method, either in combination to make use of the strengths of both methods, or in parallel to obtain a broader decision basis for the decision maker. Previous studies of MCDA in water supply planning have usually considered water supply networks with only one water service delivery. Advanced water supply sources with multiple water service delivery systems have been neglected. This is an on-going study in which analytical hierarchical multi-criteria decision analysis methods are proposed for solving water supply problems and a framework for improved rainwater harvesting systems will be developed.展开更多
This paper presents a case study about a condition monitoring project for asset management implementing an advanced decision process for maintenance and asset replacement in the Qatar electricity distribution network....This paper presents a case study about a condition monitoring project for asset management implementing an advanced decision process for maintenance and asset replacement in the Qatar electricity distribution network. It describes the principles used to produce an assessment of the health of the entire fleet of assets, together with the concepts retained to prioritize the interventions on the distribution network equipment. The paper goes through the actual steps taken for the preparation and execution mode of the overall project. It covers the following project phases: definition of the problem & business objectives, process definition and preparation tasks, presentation of solutions and execution phase. The project being still in the implementation phase, the conclusions are preliminary but already demonstrate concrete and tangible benefits.展开更多
文摘Several conflicting objectives are considered in decision-making. MCDA (multi-criteria decision analysis) methods are developed to facilitate better decision making by decision-makers. Water supply problems are complex problems with multiple decision making and criteria. Hence, the use of multi-criteria decision analysis is very appropriate for solving these problems. Multi-criteria decision analysis can be divided into three main groups: value measurement models, goals, aspiration and reference level models and outranking models. The methods listed have been applied to water supply problems, especially in the evaluation of alternative water supply strategies. Each method has its advantages and limitations. A good alternative for concluding a better-suited method for water supply problems is to apply more than one method, either in combination to make use of the strengths of both methods, or in parallel to obtain a broader decision basis for the decision maker. Previous studies of MCDA in water supply planning have usually considered water supply networks with only one water service delivery. Advanced water supply sources with multiple water service delivery systems have been neglected. This is an on-going study in which analytical hierarchical multi-criteria decision analysis methods are proposed for solving water supply problems and a framework for improved rainwater harvesting systems will be developed.
文摘This paper presents a case study about a condition monitoring project for asset management implementing an advanced decision process for maintenance and asset replacement in the Qatar electricity distribution network. It describes the principles used to produce an assessment of the health of the entire fleet of assets, together with the concepts retained to prioritize the interventions on the distribution network equipment. The paper goes through the actual steps taken for the preparation and execution mode of the overall project. It covers the following project phases: definition of the problem & business objectives, process definition and preparation tasks, presentation of solutions and execution phase. The project being still in the implementation phase, the conclusions are preliminary but already demonstrate concrete and tangible benefits.