In this paper, operation characteristic of condensate polishing system is studied during startup, based on generator blowdown limit, given limit ion concentration in condensate during condenser leakage. Further give c...In this paper, operation characteristic of condensate polishing system is studied during startup, based on generator blowdown limit, given limit ion concentration in condensate during condenser leakage. Further give conclusion about condensate polishing system configuration and operation requirement: full flow condensate polishing system (CPS) is necessary to the units cooled by sea water, and it is better that one or two series put in service during normal operation other than all of them in hot standby. While continuous condensate tube leakage is 256 L/h, the units cooled by fresh water will be shutdown immediately, for this level leakage, whichever condensate polishing system capacity is 50% (30%) or 100%, action level 2 will be preformed, so 50% (30%) is enough for fresh water cooled units.展开更多
文摘In this paper, operation characteristic of condensate polishing system is studied during startup, based on generator blowdown limit, given limit ion concentration in condensate during condenser leakage. Further give conclusion about condensate polishing system configuration and operation requirement: full flow condensate polishing system (CPS) is necessary to the units cooled by sea water, and it is better that one or two series put in service during normal operation other than all of them in hot standby. While continuous condensate tube leakage is 256 L/h, the units cooled by fresh water will be shutdown immediately, for this level leakage, whichever condensate polishing system capacity is 50% (30%) or 100%, action level 2 will be preformed, so 50% (30%) is enough for fresh water cooled units.