期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
斜井双钩提升运输的补充设计 被引量:1
1
作者 王秀峰 桑志勇 张昭慧 《山东煤炭科技》 2014年第8期93-94,共2页
该文介绍了双滚筒绞车斜井提升、下放物料时,上行与下行车辆分道运行的设计;斜巷提升时防止上行车辆与下行车辆进入同一轨道运行的自动扳道装置。
关键词 双滚筒提升运输 分道运行 自动扳道装置
下载PDF
The analysis on reservoir sediment deposition and downstream river channel scouring after impoundment and operation of TGP 被引量:1
2
作者 Lu Jinyou Huang Yue Wang Jun 《Engineering Sciences》 EI 2011年第3期113-120,共8页
According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research... According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future. 展开更多
关键词 Three Gorges Project (TGP) trial impoundment reservoir sediment deposition downstream river channel scouring
下载PDF
Risk Assessment Based on Fault Tree Analysis for Damaged Pipe Repair During Operation in Petrochemical Plant 被引量:3
3
作者 丛广佩 高金吉 +1 位作者 杨剑锋 刘文彬 《Transactions of Tianjin University》 EI CAS 2013年第1期70-78,共9页
In petrochemical plant, the in-operation repairing is usually a repairing strategy with pressured inoperation repairing for avoiding huge economic losses caused by unplanned shutdown when some slight local leakage hap... In petrochemical plant, the in-operation repairing is usually a repairing strategy with pressured inoperation repairing for avoiding huge economic losses caused by unplanned shutdown when some slight local leakage happens in pipes. This paper studies the effects of repairing strategies on the failure probability of the pipe systems in process industries based on the time-average fault tree approach, especially the in-operation repairing strategies including pressured in-operation repairing activities. The fault tree model can predict the effect of different repairing plans on the pipe failure probability, which is significant to the optimization of the repairing plans. At first pipes are distinguished into four states in this model, i.e., successive state, flaw state, leakage state and failure state. Then the fault tree approach, which is usually applied in the studies of dynamic equipment, is adopted to model the pipe failure. Moreover, the effect of pressured in-operation repairing is also considered in the model. In addition, this paper proposes a series of time-average parameters of the fault tree model, all of which are used to calculate node parameters of the fault tree model. At last, a practical case is calculated based on the fault tree model in a repairing activity of pipe thinning. 展开更多
关键词 pressured in-operation repairing risk uncertainty quantification fault tree failure probability leak before break (LBB)
下载PDF
Measuring speed consistency for freeway diverge areas using factor analysis 被引量:2
4
作者 曲栩 郭唐仪 +1 位作者 王炜 胡启洲 《Journal of Central South University》 SCIE EI CAS 2013年第1期267-273,共7页
Although either absolute speed or speed difference can be considered as a measure for speed consistency, few researches consider both in practice. The factor analysis method was introduced to extract an optimal number... Although either absolute speed or speed difference can be considered as a measure for speed consistency, few researches consider both in practice. The factor analysis method was introduced to extract an optimal number of factors from numerous original measures. The freeway diverging zone was divided into four elements, namely the upstream, the diverge area, the downstream and the exit ramp. Operating speeds together with individual vehicle speeds were collected at each element with radar guns. Following the factor analysis procedure, two factors, which explain 96.722% of the variance in the original data, were retained from the initial seven speed measures. According to the loadings after Varimax rotation, the two factors are clearly classified into two categories. The first category is named "speed scale" reflecting the absolute speed, and the other one is named "speed dispersion" interpreting speed discreteness. Then, the weighted score of speed consistency for each diverge area is given in terms of linear combination of the two retained factors. To facilitate the level classification of speed consistency, the weighted scores are normalized in the range of (0, 1.0). The criterion for speed consistency classification is given as 0≤F N <0.30, good consistency; 0.30≤F N <0.60, fair consistency; 0.60≤ F N ≤1.00, poor consistency. The validation by comparing with previously developed measures shows that the proposed measure is acceptable in evaluating speed consistency. 展开更多
关键词 SAFETY FREEWAY speed consistency factor analysis
下载PDF
Research on Risk Analysis and Avoidance of Private Financing
5
作者 Yayun Li 《International Journal of Technology Management》 2014年第12期116-117,共2页
Private financing is a supplementary of financial services and capital market allocation of resources, and it is also an important financing channel for SMEs and an important factor which has great impact on economic ... Private financing is a supplementary of financial services and capital market allocation of resources, and it is also an important financing channel for SMEs and an important factor which has great impact on economic and financial operations. However, with the growing scale of private financing, there are large potential risks which affect the normal operation of private financing, and even affect the long-term development of financial markets. This paper analyzes the current situation of private financing and risks existing in current private financing, and propose some ways to avoid the risk of private financing, to provide a theoretical basis for future research on private financing risks. 展开更多
关键词 RISK Private Financing AVOIDANCE
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部