According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research...According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.展开更多
In petrochemical plant, the in-operation repairing is usually a repairing strategy with pressured inoperation repairing for avoiding huge economic losses caused by unplanned shutdown when some slight local leakage hap...In petrochemical plant, the in-operation repairing is usually a repairing strategy with pressured inoperation repairing for avoiding huge economic losses caused by unplanned shutdown when some slight local leakage happens in pipes. This paper studies the effects of repairing strategies on the failure probability of the pipe systems in process industries based on the time-average fault tree approach, especially the in-operation repairing strategies including pressured in-operation repairing activities. The fault tree model can predict the effect of different repairing plans on the pipe failure probability, which is significant to the optimization of the repairing plans. At first pipes are distinguished into four states in this model, i.e., successive state, flaw state, leakage state and failure state. Then the fault tree approach, which is usually applied in the studies of dynamic equipment, is adopted to model the pipe failure. Moreover, the effect of pressured in-operation repairing is also considered in the model. In addition, this paper proposes a series of time-average parameters of the fault tree model, all of which are used to calculate node parameters of the fault tree model. At last, a practical case is calculated based on the fault tree model in a repairing activity of pipe thinning.展开更多
Although either absolute speed or speed difference can be considered as a measure for speed consistency, few researches consider both in practice. The factor analysis method was introduced to extract an optimal number...Although either absolute speed or speed difference can be considered as a measure for speed consistency, few researches consider both in practice. The factor analysis method was introduced to extract an optimal number of factors from numerous original measures. The freeway diverging zone was divided into four elements, namely the upstream, the diverge area, the downstream and the exit ramp. Operating speeds together with individual vehicle speeds were collected at each element with radar guns. Following the factor analysis procedure, two factors, which explain 96.722% of the variance in the original data, were retained from the initial seven speed measures. According to the loadings after Varimax rotation, the two factors are clearly classified into two categories. The first category is named "speed scale" reflecting the absolute speed, and the other one is named "speed dispersion" interpreting speed discreteness. Then, the weighted score of speed consistency for each diverge area is given in terms of linear combination of the two retained factors. To facilitate the level classification of speed consistency, the weighted scores are normalized in the range of (0, 1.0). The criterion for speed consistency classification is given as 0≤F N <0.30, good consistency; 0.30≤F N <0.60, fair consistency; 0.60≤ F N ≤1.00, poor consistency. The validation by comparing with previously developed measures shows that the proposed measure is acceptable in evaluating speed consistency.展开更多
Private financing is a supplementary of financial services and capital market allocation of resources, and it is also an important financing channel for SMEs and an important factor which has great impact on economic ...Private financing is a supplementary of financial services and capital market allocation of resources, and it is also an important financing channel for SMEs and an important factor which has great impact on economic and financial operations. However, with the growing scale of private financing, there are large potential risks which affect the normal operation of private financing, and even affect the long-term development of financial markets. This paper analyzes the current situation of private financing and risks existing in current private financing, and propose some ways to avoid the risk of private financing, to provide a theoretical basis for future research on private financing risks.展开更多
基金support from the Technology Pillar Program during the"Eleventh Five-year Plan"Period (No.2006BAB05B02No.2006BAB05B03) are acknowledged
文摘According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.
基金Supported by National Science and Technology Pillar Program in the Twelfth Five-Year Plan (No. 2011BAK06B02)National Basic Research Program of China ("973" Program, No. 2012CB026000)
文摘In petrochemical plant, the in-operation repairing is usually a repairing strategy with pressured inoperation repairing for avoiding huge economic losses caused by unplanned shutdown when some slight local leakage happens in pipes. This paper studies the effects of repairing strategies on the failure probability of the pipe systems in process industries based on the time-average fault tree approach, especially the in-operation repairing strategies including pressured in-operation repairing activities. The fault tree model can predict the effect of different repairing plans on the pipe failure probability, which is significant to the optimization of the repairing plans. At first pipes are distinguished into four states in this model, i.e., successive state, flaw state, leakage state and failure state. Then the fault tree approach, which is usually applied in the studies of dynamic equipment, is adopted to model the pipe failure. Moreover, the effect of pressured in-operation repairing is also considered in the model. In addition, this paper proposes a series of time-average parameters of the fault tree model, all of which are used to calculate node parameters of the fault tree model. At last, a practical case is calculated based on the fault tree model in a repairing activity of pipe thinning.
基金Project(2012CB725400) supported by the National Key Basic Research Program of ChinaProject(2012AA112304) supported by the National High Technology Research and Development Program of ChinaProject(2009BAG13A07-5) supported by National Science and Technology Plan of Action of China for Traffic Safety
文摘Although either absolute speed or speed difference can be considered as a measure for speed consistency, few researches consider both in practice. The factor analysis method was introduced to extract an optimal number of factors from numerous original measures. The freeway diverging zone was divided into four elements, namely the upstream, the diverge area, the downstream and the exit ramp. Operating speeds together with individual vehicle speeds were collected at each element with radar guns. Following the factor analysis procedure, two factors, which explain 96.722% of the variance in the original data, were retained from the initial seven speed measures. According to the loadings after Varimax rotation, the two factors are clearly classified into two categories. The first category is named "speed scale" reflecting the absolute speed, and the other one is named "speed dispersion" interpreting speed discreteness. Then, the weighted score of speed consistency for each diverge area is given in terms of linear combination of the two retained factors. To facilitate the level classification of speed consistency, the weighted scores are normalized in the range of (0, 1.0). The criterion for speed consistency classification is given as 0≤F N <0.30, good consistency; 0.30≤F N <0.60, fair consistency; 0.60≤ F N ≤1.00, poor consistency. The validation by comparing with previously developed measures shows that the proposed measure is acceptable in evaluating speed consistency.
文摘Private financing is a supplementary of financial services and capital market allocation of resources, and it is also an important financing channel for SMEs and an important factor which has great impact on economic and financial operations. However, with the growing scale of private financing, there are large potential risks which affect the normal operation of private financing, and even affect the long-term development of financial markets. This paper analyzes the current situation of private financing and risks existing in current private financing, and propose some ways to avoid the risk of private financing, to provide a theoretical basis for future research on private financing risks.