期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
预应力混凝土连续梁桥合拢段施工工艺的实施和研究 被引量:3
1
作者 王洁 彭申凯 《安徽建筑》 2007年第5期105-107,122,共4页
文章通过介绍滁河大桥主桥预应力合拢段施工工艺,阐述了预应力混凝土连续梁的合拢段施工中应加以注意的临时固结措施、体系转换和预应力施工等的施工工艺,并对其理论依据作了简要分析。
关键词 预应力混凝土连续梁 悬浇 合拢段 刚性接杆 预应力张拉
下载PDF
Development of Chinese large-scale space end-effector 被引量:6
2
作者 刘宏 谭益松 +3 位作者 刘伊威 介党阳 高凯 蔡鹤皋 《Journal of Central South University》 SCIE EI CAS 2011年第3期600-609,共10页
In order to achieve large tolerance capture and high stiffness connection for space payload operations,a Chinese large-scale space end-effector (EER) was developed.Three flexible steel cables were adopted to capture t... In order to achieve large tolerance capture and high stiffness connection for space payload operations,a Chinese large-scale space end-effector (EER) was developed.Three flexible steel cables were adopted to capture the payload with large capture allowance.Ball screw transmission mechanism and plane shape-constraint four bar linkage mechanism were utilized to connect the payload with high stiffness.The experiments show that capture tolerances in X,Y,Z,Pitch,Yaw,Roll directions are 100 mm,100 mm,120 mm,10.5°,10.5°,12°,respectively.The maximum connection stiffness is 4 800 N·m.The end-effector could meet the requirements for space large tolerance capture and high stiffness connection in the future. 展开更多
关键词 large tolerance capture high stiffness connection END-EFFECTOR flexible steel cable ball screw four bar linkage
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部