期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
滇北禄武彝区基督教传播与柏格里彝文的创制使用与影响
1
作者 普忠良 张耀天 《红河学院学报》 2018年第5期33-39,共7页
在一个多世纪以来,基督教得以在滇北禄武彝区传播,柏格里彝文得以创制和使用有其客观的历史原因。虽然在一些方面有其积极的一面,但对彝族传统文化传承而言,它无疑促使了彝族传统文化和原始宗教信仰发生了非本体化的变异,很多优秀的彝... 在一个多世纪以来,基督教得以在滇北禄武彝区传播,柏格里彝文得以创制和使用有其客观的历史原因。虽然在一些方面有其积极的一面,但对彝族传统文化传承而言,它无疑促使了彝族传统文化和原始宗教信仰发生了非本体化的变异,很多优秀的彝族传统文化逐步流失,处于无人传承甚至濒危的境地。 展开更多
关键词 滇北 禄武彝区 基督教 传播 柏格里彝文 创制使用 影响
下载PDF
Limitations of Cost Estimation Using Building Information Modeling in Poland
2
作者 Krzysztof Zima Agnieszka Legniak 《Journal of Civil Engineering and Architecture》 2013年第5期545-554,共10页
BIM (building information modeling) is a technological innovation, not only during the design process, but also during the planning and preparation stages of a construction project, as it also supports making invest... BIM (building information modeling) is a technological innovation, not only during the design process, but also during the planning and preparation stages of a construction project, as it also supports making investment decisions. An innovation which is comparable, if only slightly less significant, was the transition from using 2D systems to the 3D structural model design. The article outlines the advantages of using BIM in the preparatory stages of a construction project. It also presents benefits which relate to the employment of the BIM system in cost estimation process. The article describes the Zuzia BIM system which uses the BIM model, as this system has just been created in Poland for the purpose of construction cost estimation. The preparation of the bill of quantities is automated in this system and this has been achieved on the basis of data directly obtained from virtual models of buildings, which were carried out thanks to the collaboration of various design sectors. The article authors, using their own experience, present difficulties which can be encountered by cost estimators in Poland when calculating the value of a building with the help of the BIM concept. The article shows the design errors that prevent or hinder takeoff automatic calculation based on BIM model. Design errors shown in the article are for example reinforcement bars have been defined by a designer as elements hollow in the middle or as one element for the whole building, one type of elements assigned as few different or incorrect defining of elements in relation to the type of works. 展开更多
关键词 BIM cost estimation 3D virtual model.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部