Implementation of simultaneous execution phases in the concurrent engineering (CE) needs careful planning when the downstream phase could be activated as the upstream phase developed to a certain point. The determinat...Implementation of simultaneous execution phases in the concurrent engineering (CE) needs careful planning when the downstream phase could be activated as the upstream phase developed to a certain point. The determination of startup time of overlapping jobs in CE has long been a disturbance in manufacturing industry implementing CE programs. A novel model based on both fuzzy logic and neural network is proposed to mathematically formulate the inter-connective information between the two coupled phases in CE projects, and to determine the startup time of downstream phases in real time. The information transferring between the two coupled phases is quantified by using the negative Shannon entropy. Based on this algorithm, a PDM-based framework is proposed to narrow the gap between pro-duct design and manufacture, in which five modules are built to monitor, reshuffle and implement the simultaneous executing processes. Finally, an example is given to illustrate applications of the algorithm in the real world.展开更多
文摘Implementation of simultaneous execution phases in the concurrent engineering (CE) needs careful planning when the downstream phase could be activated as the upstream phase developed to a certain point. The determination of startup time of overlapping jobs in CE has long been a disturbance in manufacturing industry implementing CE programs. A novel model based on both fuzzy logic and neural network is proposed to mathematically formulate the inter-connective information between the two coupled phases in CE projects, and to determine the startup time of downstream phases in real time. The information transferring between the two coupled phases is quantified by using the negative Shannon entropy. Based on this algorithm, a PDM-based framework is proposed to narrow the gap between pro-duct design and manufacture, in which five modules are built to monitor, reshuffle and implement the simultaneous executing processes. Finally, an example is given to illustrate applications of the algorithm in the real world.