期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
商业秘密刑民交叉案件审理模式的再思考 被引量:9
1
作者 王立梅 张军强 《江淮论坛》 CSSCI 北大核心 2020年第1期116-123,F0003,共9页
在商业秘密刑民交叉案件中,对先刑后民模式进行彻底式的批判,存在矫枉过正之嫌。在内在逻辑上,商业秘密刑民交叉案件不同于合同诈骗等其他刑民交叉案件,权利人并不过分追求民事赔偿,反而,对寻求刑事保护有着更为强烈的愿望和需求。这源... 在商业秘密刑民交叉案件中,对先刑后民模式进行彻底式的批判,存在矫枉过正之嫌。在内在逻辑上,商业秘密刑民交叉案件不同于合同诈骗等其他刑民交叉案件,权利人并不过分追求民事赔偿,反而,对寻求刑事保护有着更为强烈的愿望和需求。这源于权利更在意实现知识产权背后的"垄断力"。先刑后民模式不仅没有引发公利益与私利益之间的紧张,还实现了公利益与第一层级利益之间方向的一致。在程序开展上,先刑后民可以通过证据保全的方式实现财产保全,实现高效止损的制度效果。此外,当前的知识产权司法改革更适用于先刑后民模式,知识产权"三合一"可以克服专业性强、判决冲突、管辖错位等问题。因此,在商业秘密案件中,应当为先刑后民模式正名。 展开更多
关键词 商业秘密 刑民交叉 利益分层 知识产权
下载PDF
RePizer:a framework for prioritization of software requirements 被引量:2
2
作者 Saif Ur Rehman KHAN Sai Peck LEE +3 位作者 Mohammad DABBAGH Muhammad TAHIR Muzafar KHAN Muhammad ARIF 《Frontiers of Information Technology & Electronic Engineering》 SCIE EI CSCD 2016年第8期750-765,共16页
The standard software development life cycle heavily depends on requirements elicited from stakeholders. Based on those requirements, software development is planned and managed from its inception phase to closure. Du... The standard software development life cycle heavily depends on requirements elicited from stakeholders. Based on those requirements, software development is planned and managed from its inception phase to closure. Due to time and resource constraints, it is imperative to identify the high-priority requirements that need to be considered first during the software development process. Moreover, existing prioritization frameworks lack a store of historical data useful for selecting the most suitable prioritization technique of any similar project domain. In this paper, we propose a framework for prioritization of software requirements, called Re Pizer, to be used in conjunction with a selected prioritization technique to rank software requirements based on defined criteria such as implementation cost. ReP izer assists requirements engineers in a decision-making process by retrieving historical data from a requirements repository. Re Pizer also provides a panoramic view of the entire project to ensure the judicious use of software development resources. We compared the performance of Re Pizer in terms of expected accuracy and ease of use while separately adopting two different prioritization techniques, planning game(PG) and analytical hierarchy process(AHP). The results showed that Re Pizer performed better when used in conjunction with the PG technique. 展开更多
关键词 Software requirements Requirements prioritization techniques Prioritization framework Planning game Analytical hierarchy process
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部