狭窄河道场地制梁施工技术解析
1
作者 张杏军 《运输经理世界》 2020年第10期153-154,共2页
在狭窄河道场地内应用制梁施工技术难度较大,因此为了保证桥梁工程顺利竣工,应紧紧围绕场地施工条件逐步落实制梁施工内容.在此基础上,本文主要以陕西省西乡至镇巴高速公路项目为例,简要分析了狭窄河道场地制梁施工项目案例,并从科学设... 在狭窄河道场地内应用制梁施工技术难度较大,因此为了保证桥梁工程顺利竣工,应紧紧围绕场地施工条件逐步落实制梁施工内容.在此基础上,本文主要以陕西省西乡至镇巴高速公路项目为例,简要分析了狭窄河道场地制梁施工项目案例,并从科学设计箱梁台座、严控箱梁腹板坡度、有效引进变压器、制定预制梁方案等方面,保证狭窄河道场地制梁作业质量的提升. 展开更多
关键词 狭窄河道场地 制梁施工技术
原文传递
Construction and control technology of the main bridge superstructure of Sutong Bridge
2
作者 Zhang Hong Luo Chenbin +1 位作者 Zhang Yongtao You Xinpeng 《Engineering Sciences》 EI 2009年第1期76-82,共7页
The Sutong Yangtze River Bridge(short as Sutong Bridge)is now the largest span cable-stayed bridge in the world.The construction of the superstructure of the middle bridge covered several stages including erection of ... The Sutong Yangtze River Bridge(short as Sutong Bridge)is now the largest span cable-stayed bridge in the world.The construction of the superstructure of the middle bridge covered several stages including erection of the big block girders for the side span,assistant span and tower area,erection of standard girders and closure of the middle span.The big block girders were hoisted by a floating crane,and the standard girders were hoisted by a double crane system on the deck.The pushing assistant method was adopted for the middle span closure construction.Furthermore,key technologies and innovative methods used in the processes of girder erection and cable assemblage in all stages were expatiated systematically.An all-stage self-adaptive geometry control method was used in the construction process.By accurately controlling the unstressed dimensions and shape of all structural components in each step,and realization that the control system and the controlled system adapt to each other,the goal was to make control of the final line shape and inner force of the bridge structure achievable.Two solutions,including GPS based and total station based dynamic geometry monitoring systems,were used to resolve the measure problem under the wide-range of wind-induced vibrations in the long cantilever state.Finally,research on the wind-induced vibration of the superstructure during the construction period was executed.Buffeting response analysis to the longest single and double cantilever states were carried out.The analysis and evaluation of wind resistance safety of the main girders under the longest single cantilever state was made,and corresponding wind resistance measures were suggested.The as-built geometric error and cable force error were controlled in a required design range,and this whole technological achievement can be a benchmark for construction of other large span cable-stayed bridges in the future. 展开更多
关键词 Sutong Bridge SUPERSTRUCTURE construction method construction control geometry control wind-resistant measure