莫斯科鲁什尼科中心体育场加顶工程
1
《世界建筑导报》 1998年第3期50-51,共2页
总面积为200×40平方米的BSA体育场加顶工程按国际体育设施标准如期完成。它由看台上的一个40,000平方米的固定部分和运动场上空的一个20,000平方米的可移动部分组成。同时需要修复的有看台下面的空间,观众席的长条凳换成单个座位,... 总面积为200×40平方米的BSA体育场加顶工程按国际体育设施标准如期完成。它由看台上的一个40,000平方米的固定部分和运动场上空的一个20,000平方米的可移动部分组成。同时需要修复的有看台下面的空间,观众席的长条凳换成单个座位,看台的分色计划以及主席台、观众席重新刷漆等,计划在1998年完成。 从正在施工的屋顶图和剖面图上可以清楚地看出,这个庞大的自成体系加顶屋盖结构工程的组成与支承情况,也反映了俄罗斯传统金属结构加工的精湛技艺。 展开更多
关键词 体育场 加项工程 建筑设计 莫斯科
下载PDF
Delays to Large Construction Projects in Ghana: A Risk Overview
2
作者 Joseph Ignatius Teye Buertey Augustine Kaku Miezah Theophilus Adjei Kumi 《Journal of Civil Engineering and Architecture》 2014年第3期367-377,共11页
Delay to large scale projects, which is as a result of actions or inactions of some project stakeholders, is becoming a global phenomena and Ghana is no exception. The objective of the research is to identify, rate an... Delay to large scale projects, which is as a result of actions or inactions of some project stakeholders, is becoming a global phenomena and Ghana is no exception. The objective of the research is to identify, rate and rank the most significant risk factors that causes delay on projects and examine the social impact of these delays to recommend modalities to help mitigate these risk factors. The study adopted quantitative methods with the distribution of 144 questionnaires to built environment professionals receiving a response rate of 75.7%. The instrument listed 58 common factors under eight categories that contribute to the causes of delay for respondents to rate. Analysis of data non-parametric test revealed that client, contractor, material and finance category factors significantly resulted in the schedule delay of large infrastructural projects. The survey analysis revealed that micro-factors that result in delays to large construction projects are time constraint, cost overrun, payment problems, dispute and litigation. The research recommended the following modalities to minimize such delays: availability of resources, improved communication and coordination, proper scope definition and feasibilities, utilization of modern technology, appropriate application of technologically based systems and competent project management's structures. 展开更多
关键词 Cost overruns delayed payment disputes risk and social impact.
下载PDF