期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
浅议健美操教学中采用动作定量与对应素质练习
1
作者 闫雪辉 《黑龙江省政法管理干部学院学报》 2013年第3期157-158,共2页
在健美操教学中,为提高教学质量。根据教学内容采用动作定量与对应素质进行教学,即每次课根据动作难、中、易,采取循序渐进的教学方法,进行定量安排动作内容。同时按动作要求,进行相应的定量素质练习。通过半年的教学实践,经过试验对比... 在健美操教学中,为提高教学质量。根据教学内容采用动作定量与对应素质进行教学,即每次课根据动作难、中、易,采取循序渐进的教学方法,进行定量安排动作内容。同时按动作要求,进行相应的定量素质练习。通过半年的教学实践,经过试验对比,实验组成绩明显好于对照组。说明所采用的教学方法,是符合教学原则的,并收到了较好的效果。 展开更多
关键词 动作定量 对应素质 循序渐进
下载PDF
心得安治疗迟发性运动障碍——与安慰剂作双盲自身交叉对照 被引量:2
2
作者 盛嘉玲 赵灵 苏敏 《上海精神医学》 1990年第1期18-19,共2页
作者用双盲自身交叉对照法观察心得安与安慰剂治疗迟发性运动障碍(TD)的疗效。结果显示心得安与安慰剂的疗效未见明显差别。
关键词 迟发性运动障碍(TD) 心得安 异常不自主动作定量 AIMS.
下载PDF
Optimum line reclosing time for the enhancement of interconnected power system stability
3
作者 蔡国伟 K. W. CHAN +1 位作者 孙鑫 谢东岩 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2003年第4期422-428,共7页
Automatic line reclosing schemes used in an extra-high-voltage power system is an economical and effective means to maintain transient stability. A novel method is proposed in the paper to adaptively optimize the auto... Automatic line reclosing schemes used in an extra-high-voltage power system is an economical and effective means to maintain transient stability. A novel method is proposed in the paper to adaptively optimize the automatic line reclosing time after a transient fault for enhancement of interconnected power system transient stability. Both the study on the transient energy over network and the structure-preserving multi-machines power system model illustrate that the excessive convergence of potential energy on the lines with a certain cutset deteriorate power system stability, and therefore, an optimum line reclosing strategy can be established by minimizing the change in transient potential energy distribution across a cutset lines in the vicinity of the faulty line as an optimization target, and the optimal reclosure time is set to the time of minimum line phase angle difference. Without any pre-determined knowledge, the method is adaptive to various power system operation modes and fault conditions, and easy to implement because only a limited number of data measured at one location on a tie-line linking sub-networks are required. Simulations have been performed with the OMIB(One Machine and Infinite Bus System) and a real inter-connected power system to verify the applicability of the method proposed. 展开更多
关键词 power system stability automatic line reclosing scheme network transient energy optimum reclosing time
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部