期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
零售商长期后悔规避的供应链网络动态均衡 被引量:9
1
作者 徐明姣 周岩 《中国管理科学》 CSSCI CSCD 北大核心 2018年第5期109-117,共9页
本文研究了基于时变随机需求的供应链网络动态均衡。由于需求的不确定性和季节性,网络中的零售商会考虑缺货后悔和存货后悔的负效用,基于长期后悔规避效用做出最优决策。利用变分不等式,刻画了网络中制造商层、考虑长期后悔规避效用的... 本文研究了基于时变随机需求的供应链网络动态均衡。由于需求的不确定性和季节性,网络中的零售商会考虑缺货后悔和存货后悔的负效用,基于长期后悔规避效用做出最优决策。利用变分不等式,刻画了网络中制造商层、考虑长期后悔规避效用的零售商层和需求市场层的均衡决策行为。通过数值算例,基于三种长期后悔情形分析了零售商长期后悔规避行为对其均衡订购量、利润、后悔值的影响。研究结果表明,零售商的长期后悔规避程度在不断增加、保持不变,不断减少这三种情况下,对其均衡订购量、利润、后悔值的影响不同。研究结论将指导供应链网络中企业,基于长期后悔规避制定最优决策。 展开更多
关键词 供应链网络 动态均衡决策 后悔规避 长期
原文传递
Dynamic time-cost-quality tradeoff of rockfill dam construction based on real-time monitoring 被引量:4
2
作者 Deng-hua ZHONG Wei HU +2 位作者 Bin-ping WU Zheng LI Jun ZHANG 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2017年第1期1-19,共19页
Time, cost, and quality are three key control factors in rockfill dam construction, and the tradeoff among them is important. Research has focused on the construction time-cost-quality tradeoff for the planning or des... Time, cost, and quality are three key control factors in rockfill dam construction, and the tradeoff among them is important. Research has focused on the construction time-cost-quality tradeoff for the planning or design phase, built on static empirical data. However, due to its intrinsic uncertainties, rockfill dam construction is a dynamic process which requires the tradeoffto adjust dynamically to changes in construction conditions. In this study, a dynamic time-cost-quality tradeoff (DTCQT) method is proposed to balance time, cost, and quality at any stage of the construction process. A time-cost-quality tradeoff model is established that considers time cost and quality cost. Time, cost, and quality are dynamically estimated based on real-time monitoring. The analytic hierarchy process (AHP) method is applied to quantify the decision preferences among time, cost, and quality as objective weights. In addition, an improved non-dominated sorting genetic algorithm (NSGA-II) coupled with the technique for order preference by similarity to ideal solution (TOPSIS) method is used to search for the optimal compromise solution. A case study project is analyzed to demonstrate the applicability of the method, and the efficiency of the proposed optimization method is compared with that of the linear weighted sum (LWS) and NSGA-II. 展开更多
关键词 Dynamic time-cost-quality tradeoff Rockfill dam construction Real-time monitoring Decision preferences
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部