In this study,the dynamic stress concentration factors(DSCF)around a straight-wall arch tunnel(SWAT)were solved analytically utilizing the complex variable function methods and Duhamel’s integral.The effects of wavel...In this study,the dynamic stress concentration factors(DSCF)around a straight-wall arch tunnel(SWAT)were solved analytically utilizing the complex variable function methods and Duhamel’s integral.The effects of wavelength,incident angle,and blasting rising time on the DSCF distribution were analyzed.Theoretical results pointed out dynamic disturbances resulting in compressive stress concentration in the vertical direction and tensile stress in the incident direction.As the wavelength and rising time increased,there was a tendency for the amplitude of stress concentration to initially rise and then converge.Moreover,a series of 3D FEM models were established to evaluate the effect of different initial stress states on the dynamic failure of the tunnel surrounding rock.The results indicated that the failure of the surrounding rock was significantly influenced by the direction of the static maximum principal stress and the direction of the dynamic disturbance.Under the coupling of static and blasting loading,damage around the tunnel was more prone to occur in the dynamic and static stress concentration coincidence zone.Finally,the damage modes of rock tunnel under static stress and blasting disturbance from different directions were summarized and a proposed support system was presented.The results reveal the mechanisms of deep-buried rock tunnel destruction and dynamically triggered rockburst.展开更多
This study is the result of long-term efforts of the authors’team to assess ground response of gob-side entry by roof cutting(GSERC)with hard main roof,aiming at scientific control for GSERC deformation.A comprehensi...This study is the result of long-term efforts of the authors’team to assess ground response of gob-side entry by roof cutting(GSERC)with hard main roof,aiming at scientific control for GSERC deformation.A comprehensive field measurement program was conducted to determine entry deformation,roof fracture zone,and anchor bolt(cable)loading.The results indicate that GSERC deformation presents asymmetric characteristics.The maximum convergence near roof cutting side is 458 mm during the primary use process and 1120 mm during the secondary reuse process.The entry deformation is closely associated with the primary development stage,primary use stage,and secondary reuse stage.The key block movement of roof cutting structure,a complex stress environment,and a mismatch in the supporting design scheme are the failure mechanism of GSERC.A controlling ideology for mining states,including regional and stage divisions,was proposed.Both dynamic and permanent support schemes have been implemented in the field.Engineering practice results indicate that the new support scheme can efficiently ensure long-term entry safety and could be a reliable approach for other engineering practices.展开更多
This paper puts forward a new rock fragmentation loading method of dual-cutter head combined dynamic and static loads. By applying the numerical simulation software - RFPA2D, we have done numerical experiment about th...This paper puts forward a new rock fragmentation loading method of dual-cutter head combined dynamic and static loads. By applying the numerical simulation software - RFPA2D, we have done numerical experiment about the sihstone' s crushing effect by dynamic load on single cutter head without confining pressure, dynamic load on single cut- ter head with confining pressure 10 MPa and different dual-cutter heads spacing by combined dynamic and static loads with confining pressure 10 MPa. Experimental results show that the confining pressure can obviously affect the rock frag- mentation effect. Combined dynamic and static loads can greatly improve the rock fragmentation effect. There exists an optimal spacing of dual-cutter head that can make the rock fragmentation achieve the desired effect. Through analyzing the acoustic emission accumulative energy and quantity, the authors make a conclusion that the optimum spacing is 30 mm.展开更多
The non-coupled charge explosion and geo-mechanical dynamics problem in real air condition is studied in this paper. It analyzes and calculates the problem by using the real air state equations. Through researching on...The non-coupled charge explosion and geo-mechanical dynamics problem in real air condition is studied in this paper. It analyzes and calculates the problem by using the real air state equations. Through researching on the non-coupled charge rock bench blasting with big clearance of air, its result indicates that the borehole wall reflection overpressure is far higher than strength of rock, but much lower than detonation front pressure of the charge. So non-coupled charge explosion blasting engineering is very successful. Furthermore, it introduces the method of shaft forming by blasting once and the new tube room technology. And the non-coupled charge explosion is used successfully in the method of shaft forming by blasting once. As it drills and blasts in the top and removes the broken rock from the bottom tunnel, it increases the construction efficiency significantly. This paper has important reference on the improvement of the large-span underground engineering construction.展开更多
基金Project(12072376)supported by the National Natural Science Foundation of ChinaPoject(10533220215858)supported by the Fundamental Research Funds for the Central Universities,China。
文摘In this study,the dynamic stress concentration factors(DSCF)around a straight-wall arch tunnel(SWAT)were solved analytically utilizing the complex variable function methods and Duhamel’s integral.The effects of wavelength,incident angle,and blasting rising time on the DSCF distribution were analyzed.Theoretical results pointed out dynamic disturbances resulting in compressive stress concentration in the vertical direction and tensile stress in the incident direction.As the wavelength and rising time increased,there was a tendency for the amplitude of stress concentration to initially rise and then converge.Moreover,a series of 3D FEM models were established to evaluate the effect of different initial stress states on the dynamic failure of the tunnel surrounding rock.The results indicated that the failure of the surrounding rock was significantly influenced by the direction of the static maximum principal stress and the direction of the dynamic disturbance.Under the coupling of static and blasting loading,damage around the tunnel was more prone to occur in the dynamic and static stress concentration coincidence zone.Finally,the damage modes of rock tunnel under static stress and blasting disturbance from different directions were summarized and a proposed support system was presented.The results reveal the mechanisms of deep-buried rock tunnel destruction and dynamically triggered rockburst.
基金Project(WPUKFJJ2019-19)supported by the Open Fund of State Key Laboratory of Water Resource Protection and Utilization in Coal Mining,ChinaProject(51974317)supported by the National Natural Science Foundation of China。
文摘This study is the result of long-term efforts of the authors’team to assess ground response of gob-side entry by roof cutting(GSERC)with hard main roof,aiming at scientific control for GSERC deformation.A comprehensive field measurement program was conducted to determine entry deformation,roof fracture zone,and anchor bolt(cable)loading.The results indicate that GSERC deformation presents asymmetric characteristics.The maximum convergence near roof cutting side is 458 mm during the primary use process and 1120 mm during the secondary reuse process.The entry deformation is closely associated with the primary development stage,primary use stage,and secondary reuse stage.The key block movement of roof cutting structure,a complex stress environment,and a mismatch in the supporting design scheme are the failure mechanism of GSERC.A controlling ideology for mining states,including regional and stage divisions,was proposed.Both dynamic and permanent support schemes have been implemented in the field.Engineering practice results indicate that the new support scheme can efficiently ensure long-term entry safety and could be a reliable approach for other engineering practices.
基金National Science Foundation of China (No.50974059No.50934006)
文摘This paper puts forward a new rock fragmentation loading method of dual-cutter head combined dynamic and static loads. By applying the numerical simulation software - RFPA2D, we have done numerical experiment about the sihstone' s crushing effect by dynamic load on single cutter head without confining pressure, dynamic load on single cut- ter head with confining pressure 10 MPa and different dual-cutter heads spacing by combined dynamic and static loads with confining pressure 10 MPa. Experimental results show that the confining pressure can obviously affect the rock frag- mentation effect. Combined dynamic and static loads can greatly improve the rock fragmentation effect. There exists an optimal spacing of dual-cutter head that can make the rock fragmentation achieve the desired effect. Through analyzing the acoustic emission accumulative energy and quantity, the authors make a conclusion that the optimum spacing is 30 mm.
文摘The non-coupled charge explosion and geo-mechanical dynamics problem in real air condition is studied in this paper. It analyzes and calculates the problem by using the real air state equations. Through researching on the non-coupled charge rock bench blasting with big clearance of air, its result indicates that the borehole wall reflection overpressure is far higher than strength of rock, but much lower than detonation front pressure of the charge. So non-coupled charge explosion blasting engineering is very successful. Furthermore, it introduces the method of shaft forming by blasting once and the new tube room technology. And the non-coupled charge explosion is used successfully in the method of shaft forming by blasting once. As it drills and blasts in the top and removes the broken rock from the bottom tunnel, it increases the construction efficiency significantly. This paper has important reference on the improvement of the large-span underground engineering construction.