With a water-supply network by dynamic programming. The minimal as an example, the network was optimized annual discounted costs were taken as an objective function and node pressure etc. as constraint conditions. The...With a water-supply network by dynamic programming. The minimal as an example, the network was optimized annual discounted costs were taken as an objective function and node pressure etc. as constraint conditions. The alternative pipe diameters were optimized as per enumeration method and the group allowing objective function with the least values would be the optimized one. It is proved the optimized pipe network reduced by 11.49% in terms of cost and the optimized ben- efits proved much significant.展开更多
In order to maximize the overall economic gain from a metal mine operation, selection of cutoff grades must consider two important aspects: the time value of money and the spatial variation of the grade distribution i...In order to maximize the overall economic gain from a metal mine operation, selection of cutoff grades must consider two important aspects: the time value of money and the spatial variation of the grade distribution in the deposit. That is, cutoff grade selection must be dynamic with respect to both time and space. A newly developed method that fulfills these requirements is presented. In this method, the deposit or a portion of it under study is divided into "decision units" based on the mining method and sample data. The statistical grade distribution and the grade-tonnage relationship of each decision unit are then computed based on the samples falling in the unit. Each decision unit with its grade-tonnage relationship is considered as a stage in a dynamic programming scheme and the problem is solved by applying a forward dynamic programming based algorithm with an objective function of maximizing the overall net present value (NPV). A software package is developed for the method and applied to an underground copper mine in Africa.展开更多
The aim of this study is to evaluate the current state of rural area development at the county level in the eastern coastal China. An evaluation index system including 18 factors was developed, and a rural development...The aim of this study is to evaluate the current state of rural area development at the county level in the eastern coastal China. An evaluation index system including 18 factors was developed, and a rural development index (RDI) was constructed to evaluate rural development state in 2000, 2004, and 2008. The quantitative evaluation indicated the following results. 1) This study derived four dominating components by means of principal component analysis, which can explain 78.2% of the total information, namely agricultural production input, the basic condition of agriculture, the comparative effectiveness of grain production, and the household′s own basic conditions. 2) Since the turn of the new millennium, the rural area in the eastern coastal China has experienced a rapid development in general. Well developed, developed, moderately developed and undeveloped rural areas respectively occupied 29.32%, 22.33%, 21.91%, and 10.51% in 2008. 3) The countryside had maintained a sound momentum of developing trend between 2000 and 2008, while the rural development in the eastern coastal China lacked sustainability. And 4) industrialization, urbanization, original economic basis, and location are four major driving forces of the disparity of rural area development in the eastern coastal China. Given these results, the strategies and policies for the improvement of each rural group were put forward.展开更多
Aim To find a more efficient learning method based on temporal difference learning for delayed reinforcement learning tasks. Methods A kind of Q learning algorithm based on truncated TD( λ ) with adaptive scheme...Aim To find a more efficient learning method based on temporal difference learning for delayed reinforcement learning tasks. Methods A kind of Q learning algorithm based on truncated TD( λ ) with adaptive schemes of λ value selection addressed to absorbing Markov decision processes was presented and implemented on computers. Results and Conclusion Simulations on the shortest path searching problems show that using adaptive λ in the Q learning based on TTD( λ ) can speed up its convergence.展开更多
Laboratory-scale experiments were carried out to evaluate the influences of operational parameters on the melt crystallization efficiency for p-cresol purification.The optimal crystallization conditions were determine...Laboratory-scale experiments were carried out to evaluate the influences of operational parameters on the melt crystallization efficiency for p-cresol purification.The optimal crystallization conditions were determined:dynamic pulsed aeration at 90 L·h-1 and the cooling rate of 0.6-0.8 ℃·min-1,followed by sweating at 0.2-0.3 ℃·min-1 for 40 min.Results also demonstrate that the melt crystallization efficiency is sensitive to feed concentration,which highlights this technology for separation and purification of high purity products.展开更多
In this study, a in vessel aerobic composting method is adopted to investigate the variation rules of various evaluation parameters (temperature, moisture content, pH, organic matter, water soluble ammonia nitrogen, ...In this study, a in vessel aerobic composting method is adopted to investigate the variation rules of various evaluation parameters (temperature, moisture content, pH, organic matter, water soluble ammonia nitrogen, water soluble nitrate nitrogen and germination index) in cocomposting of municipal sludge, kitchen waste and water hyacinth at different proportions. The results show that, in composting, the parameters of moisture content, pH, water soluble ammonia nitrogen and water soluble nitrate nitrogen demonstrate marked dynamic change rules during composting process; the temperature of three groups of compost materials rapidly rise to above 55 ~C within 96h, and last for 3 - 7d, meeting the harmless requirements, and their organic matter degradation rate excess 30%, the GI index is higher than 83%, in line with the requirements on maturity, which proves that the co-composting of municipal sludge, kitchen waste and water hyacinth can realize harmlessness and resource reutilization after composting.展开更多
Aiming at the faults of some weak nodes in the concentrated solar power-photovoltaic(CSP-PV)hybrid power generation system,it is impossible to restore the transient voltage only relying on the reactive power regulatio...Aiming at the faults of some weak nodes in the concentrated solar power-photovoltaic(CSP-PV)hybrid power generation system,it is impossible to restore the transient voltage only relying on the reactive power regulation capability of the system itself.We propose a dynamic reactive power planning method suitable for CSP-PV hybrid power generation system.The method determines the installation node of the dynamic reactive power compensation device and its compensation capacity based on the reactive power adjustment capability of the system itself.The critical fault node is determined by the transient voltage stability recovery index,and the weak node of the system is initially determined.Based on this,the sensitivity index is used to determine the installation node of the dynamic reactive power compensation device.Dynamic reactive power planning optimization model is established with the lowest investment cost of dynamic reactive power compensation device and the improvement of system transient voltage stability.Furthermore,the component of the reactive power compensation node is optimized by particle swarm optimization based on differential evolution(DE-PSO).The simulation results of the example system show that compared with the dynamic position compensation device installation location optimization method,the proposed method can improve the transient voltage stability of the system under the same reactive power compensation cost.展开更多
Economic system has phase characteristics during its developments, and certain decisions must be made during each stage, thus forming a multi-stage dynamic decision making economic system. As to this system, previous ...Economic system has phase characteristics during its developments, and certain decisions must be made during each stage, thus forming a multi-stage dynamic decision making economic system. As to this system, previous decisions have some aftereffects on its future developments, which has fundamentally contradicts the presupposition of programming methodology in Operation Research. In order to solve the problems arising from optimized theory research about the economic system, this paper defines the concept of dynamic system with aftereffects, points out the difference between its aftereffects and those of traditional stochastic processes, studies how the past decision effects on the value of optimal utility function, and gives an example on this base to illustrate its application in exploitation of oilfield.展开更多
The performance of the power assist, global optimization solved by dynamic programming (DP) method, Chery and Insight control strategies are analyzed using the mild parallel hybrid electric vehicle (PHEV) model ba...The performance of the power assist, global optimization solved by dynamic programming (DP) method, Chery and Insight control strategies are analyzed using the mild parallel hybrid electric vehicle (PHEV) model based on Insight structure. The influence of the four control strategies to the load power of the electric motor system used on parallel hybrid electric vehicle is studied. It is found that 80 percent of the motor load power points are under 1/5 of the electric peak power. The motor load power of the power assist control strategy is distributed in the widest range during generating operation, and the motor load power of the global optimization control strategy has the smallest one.展开更多
文摘With a water-supply network by dynamic programming. The minimal as an example, the network was optimized annual discounted costs were taken as an objective function and node pressure etc. as constraint conditions. The alternative pipe diameters were optimized as per enumeration method and the group allowing objective function with the least values would be the optimized one. It is proved the optimized pipe network reduced by 11.49% in terms of cost and the optimized ben- efits proved much significant.
基金Project(50974041) supported by the National Natural Science Foundation of China Project(20090450112) supported by the Postdoctoral Foundation of ChinaProject(20093910) supported by the Natural Science Foundation of Liaoning Province, China
文摘In order to maximize the overall economic gain from a metal mine operation, selection of cutoff grades must consider two important aspects: the time value of money and the spatial variation of the grade distribution in the deposit. That is, cutoff grade selection must be dynamic with respect to both time and space. A newly developed method that fulfills these requirements is presented. In this method, the deposit or a portion of it under study is divided into "decision units" based on the mining method and sample data. The statistical grade distribution and the grade-tonnage relationship of each decision unit are then computed based on the samples falling in the unit. Each decision unit with its grade-tonnage relationship is considered as a stage in a dynamic programming scheme and the problem is solved by applying a forward dynamic programming based algorithm with an objective function of maximizing the overall net present value (NPV). A software package is developed for the method and applied to an underground copper mine in Africa.
基金Under the auspices of National Natural Science Foundation of China (No. 41130748,40635029)Knowledge Innovation Program of Chinese Academy of Sciences (No. KZCX2-EW-304)
文摘The aim of this study is to evaluate the current state of rural area development at the county level in the eastern coastal China. An evaluation index system including 18 factors was developed, and a rural development index (RDI) was constructed to evaluate rural development state in 2000, 2004, and 2008. The quantitative evaluation indicated the following results. 1) This study derived four dominating components by means of principal component analysis, which can explain 78.2% of the total information, namely agricultural production input, the basic condition of agriculture, the comparative effectiveness of grain production, and the household′s own basic conditions. 2) Since the turn of the new millennium, the rural area in the eastern coastal China has experienced a rapid development in general. Well developed, developed, moderately developed and undeveloped rural areas respectively occupied 29.32%, 22.33%, 21.91%, and 10.51% in 2008. 3) The countryside had maintained a sound momentum of developing trend between 2000 and 2008, while the rural development in the eastern coastal China lacked sustainability. And 4) industrialization, urbanization, original economic basis, and location are four major driving forces of the disparity of rural area development in the eastern coastal China. Given these results, the strategies and policies for the improvement of each rural group were put forward.
文摘Aim To find a more efficient learning method based on temporal difference learning for delayed reinforcement learning tasks. Methods A kind of Q learning algorithm based on truncated TD( λ ) with adaptive schemes of λ value selection addressed to absorbing Markov decision processes was presented and implemented on computers. Results and Conclusion Simulations on the shortest path searching problems show that using adaptive λ in the Q learning based on TTD( λ ) can speed up its convergence.
基金Supported by the National Basic Research Program of China (2009CB219905)Program for Changjiang Scholars and Innovative Research Team in University (IRT0936)Innovating Fund of Tianjin University
文摘Laboratory-scale experiments were carried out to evaluate the influences of operational parameters on the melt crystallization efficiency for p-cresol purification.The optimal crystallization conditions were determined:dynamic pulsed aeration at 90 L·h-1 and the cooling rate of 0.6-0.8 ℃·min-1,followed by sweating at 0.2-0.3 ℃·min-1 for 40 min.Results also demonstrate that the melt crystallization efficiency is sensitive to feed concentration,which highlights this technology for separation and purification of high purity products.
文摘In this study, a in vessel aerobic composting method is adopted to investigate the variation rules of various evaluation parameters (temperature, moisture content, pH, organic matter, water soluble ammonia nitrogen, water soluble nitrate nitrogen and germination index) in cocomposting of municipal sludge, kitchen waste and water hyacinth at different proportions. The results show that, in composting, the parameters of moisture content, pH, water soluble ammonia nitrogen and water soluble nitrate nitrogen demonstrate marked dynamic change rules during composting process; the temperature of three groups of compost materials rapidly rise to above 55 ~C within 96h, and last for 3 - 7d, meeting the harmless requirements, and their organic matter degradation rate excess 30%, the GI index is higher than 83%, in line with the requirements on maturity, which proves that the co-composting of municipal sludge, kitchen waste and water hyacinth can realize harmlessness and resource reutilization after composting.
基金Science and Technology Projects of State Grid Corporation of China(No.SGGSKY00FJJS1800140)。
文摘Aiming at the faults of some weak nodes in the concentrated solar power-photovoltaic(CSP-PV)hybrid power generation system,it is impossible to restore the transient voltage only relying on the reactive power regulation capability of the system itself.We propose a dynamic reactive power planning method suitable for CSP-PV hybrid power generation system.The method determines the installation node of the dynamic reactive power compensation device and its compensation capacity based on the reactive power adjustment capability of the system itself.The critical fault node is determined by the transient voltage stability recovery index,and the weak node of the system is initially determined.Based on this,the sensitivity index is used to determine the installation node of the dynamic reactive power compensation device.Dynamic reactive power planning optimization model is established with the lowest investment cost of dynamic reactive power compensation device and the improvement of system transient voltage stability.Furthermore,the component of the reactive power compensation node is optimized by particle swarm optimization based on differential evolution(DE-PSO).The simulation results of the example system show that compared with the dynamic position compensation device installation location optimization method,the proposed method can improve the transient voltage stability of the system under the same reactive power compensation cost.
文摘Economic system has phase characteristics during its developments, and certain decisions must be made during each stage, thus forming a multi-stage dynamic decision making economic system. As to this system, previous decisions have some aftereffects on its future developments, which has fundamentally contradicts the presupposition of programming methodology in Operation Research. In order to solve the problems arising from optimized theory research about the economic system, this paper defines the concept of dynamic system with aftereffects, points out the difference between its aftereffects and those of traditional stochastic processes, studies how the past decision effects on the value of optimal utility function, and gives an example on this base to illustrate its application in exploitation of oilfield.
文摘The performance of the power assist, global optimization solved by dynamic programming (DP) method, Chery and Insight control strategies are analyzed using the mild parallel hybrid electric vehicle (PHEV) model based on Insight structure. The influence of the four control strategies to the load power of the electric motor system used on parallel hybrid electric vehicle is studied. It is found that 80 percent of the motor load power points are under 1/5 of the electric peak power. The motor load power of the power assist control strategy is distributed in the widest range during generating operation, and the motor load power of the global optimization control strategy has the smallest one.