期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
动静载荷试验在水利工程桩基承载力评估中的对比研究
1
作者 钟少军 《水上安全》 2024年第22期37-39,共3页
在水利工程中,对于桩的性能预测和评估是至关重要的环节,决定着工程结构的安全性和稳定性。本文着重探讨了静载荷试验与动载荷试验在水利工程中的应用,通过对比分析两种试验的结果,评估高应变动桩试验采用凯斯(CASE)法估算钻孔混凝土桩... 在水利工程中,对于桩的性能预测和评估是至关重要的环节,决定着工程结构的安全性和稳定性。本文着重探讨了静载荷试验与动载荷试验在水利工程中的应用,通过对比分析两种试验的结果,评估高应变动桩试验采用凯斯(CASE)法估算钻孔混凝土桩静力承载力的能力。通过在西樵镇太平船闸进行的四个案例研究,发现两种试验方法在预测桩的承载力方面具有较好的一致性。动载荷桩试验以其简单、快捷、成本低廉的优点,在水利工程中得到广泛应用,但为确保其准确性和可靠性,仍需通过静力试验进行校准。本文旨在为水利工程中的桩设计和优化提供有益的参考和借鉴。 展开更多
关键词 动桩载荷试验 CASE法 载荷试验 承载力 对比分析
下载PDF
Pore Water Pressure Arising during Pile Drilling in Sand
2
作者 Abdrabbo F. Khaled El-Sayed Gaaver 《Journal of Civil Engineering and Architecture》 2011年第4期331-340,共10页
The pile working load depends on the imperfections which may be taken place in pile-soil system, during pile construction, among many other factors. This subject attracted the researcher's attention world wide in the... The pile working load depends on the imperfections which may be taken place in pile-soil system, during pile construction, among many other factors. This subject attracted the researcher's attention world wide in the last decades. Types of imperfections either geotechnical or structural are documented in literature and well explained. Nevertheless, the influence of these imperfections in pile load calculations is still ambiguous. The work presented herein is devoted to study soil disturbance during construction of piles using continuous flight auger, CFA. The study of soil disturbance due to drilling needs some evidence. The source of this evidence is field observations collected from four different construction sites, which are documented in this paper. The study concluded that the disturbed zone of soil by CFA has a conical shape and extending laterally to a distance equivalent to ten times of the pile diameter around the auger at the cutting bits and has an inclined surface of4:1 (vertical : horizontal). Furthermore excess pore water pressure was induced in soil in the vicinity of pile drilling. Due to this excess pore water pressure, 3.5% to 6.5% of piles constructed by CFA showed percolation of water from the top of the piles through fresh concrete. Also, subsidence of fresh concrete in pile hole was recorded in few of the constructed piles. Pile loading tests showed that the percolation of water and/or subsidence of fresh concrete have not appreciable influence on the load-displacement characteristics of the piles. Moreover, percolation of water at pile heads. 展开更多
关键词 Pore water pressure pile drilling IMPERFECTIONS CFA water percolation
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部