A discrete-event system simulation and animation program was developed to enhance the efficiency of a truck-excavator operation and reduce the environmental impact of haulage in an open-cut coal mine with multiple-pit...A discrete-event system simulation and animation program was developed to enhance the efficiency of a truck-excavator operation and reduce the environmental impact of haulage in an open-cut coal mine with multiple-pit operations. In any mine, a key objective is to have sufficient equipment for production and not to have excess to where it becomes counterproductive. Due to the advent of responsible mining,environmental regulations, and eco-friendly practices, these factors must also be considered in the analysis. Simulation studies can be financially advantageous for both the optimization of existing mine operations and new development phases in a mine. This study is a new approach to use discrete-event system simulation for mine systems, in order to investigate and possibly reduce environmental impact considering mining haulage performance and production target. A hypothetical layout of a surface coal mine with two pit operations was used for the simulation and animation model. The simulation model includes the animation of the operation. Animation is helpful to enhance the benefit of a mine simulation model. GPSS/Hòand Proof Professionalòwere the software used for the investigation.展开更多
文摘A discrete-event system simulation and animation program was developed to enhance the efficiency of a truck-excavator operation and reduce the environmental impact of haulage in an open-cut coal mine with multiple-pit operations. In any mine, a key objective is to have sufficient equipment for production and not to have excess to where it becomes counterproductive. Due to the advent of responsible mining,environmental regulations, and eco-friendly practices, these factors must also be considered in the analysis. Simulation studies can be financially advantageous for both the optimization of existing mine operations and new development phases in a mine. This study is a new approach to use discrete-event system simulation for mine systems, in order to investigate and possibly reduce environmental impact considering mining haulage performance and production target. A hypothetical layout of a surface coal mine with two pit operations was used for the simulation and animation model. The simulation model includes the animation of the operation. Animation is helpful to enhance the benefit of a mine simulation model. GPSS/Hòand Proof Professionalòwere the software used for the investigation.