Signed direct graph (SDG) theory provides algorithms and methods that can be applied directly to chemical process modeling and analysis to validate simulation models, and is a basis for the development of a software e...Signed direct graph (SDG) theory provides algorithms and methods that can be applied directly to chemical process modeling and analysis to validate simulation models, and is a basis for the development of a software environment that can automate the validation activity. This paper is concentrated on the pretreatment of the model validation. We use the validation scenarios and standard sequences generated by well-established SDG model to validate the trends fitted from the simulation model. The results are helpful to find potential problems, assess possible bugs in the simulation model and solve the problem effectively. A case study on a simulation model of boiler is presented to demonstrate the effectiveness of this method.展开更多
Batch processes are important in chemical industry,in which operators usually play a major role and hazards may arise by their inadvertent acts.In this paper,based on hazard and operability study and concept of qualit...Batch processes are important in chemical industry,in which operators usually play a major role and hazards may arise by their inadvertent acts.In this paper,based on hazard and operability study and concept of qualitative simulation,an automatic method for adverse consequence identification for potential maloperation is proposed.The qualitative model for production process is expressed by a novel directed graph.Possible operation deviations from normal operating procedure are identified systematically by using a group of guidewords.The proposed algorithm is used for qualitative simulation of batch processes to identify the effects of maloperations.The method is illustrated with a simple batch process and a batch reaction process.The results show that batch processes can be simulated qualitatively and hazards can be identified for operating procedures including maloperations.After analysis for possible plant maloperations,some measures can be taken to avoid maloperations or reduce losses resulted from maloperations.展开更多
Long tunnel excavation with tunnel boring ily affected by uncertainties and needs to be adjusted machine (TBM) is a complex and stochastic process. It is eas- according to specific geological conditions in different...Long tunnel excavation with tunnel boring ily affected by uncertainties and needs to be adjusted machine (TBM) is a complex and stochastic process. It is eas- according to specific geological conditions in different tunnel sections, which makes the construction scheduling and management difficult. Based on the rock mass classification, this paper estimates the penetration rate. Using the rate, a cyclic network simulation (CYCLONE) model of TBM boring system is established, and the advance rates under different geological conditions are determined. Then, the impact of different cutter head thrust, which is chosen in reasonable range according to previous experiences, on pro- ject schedule is analyzed. Moreover, the simulation model of mucking system is built to determine the number of muck trains and rail intersections reasonably, regarding the efficiency of muck loading and material transporting. Based on the interaction and interrelation between TBM boring system and mucking system, the combined CY- CLONE model for the entire tunneling process is established. Then reasonable construction schedule, the utilization rate of working resources, and the probability of project completion are obtained through the model programming. At last, a project application shows the feasibility of the presented method.展开更多
文摘Signed direct graph (SDG) theory provides algorithms and methods that can be applied directly to chemical process modeling and analysis to validate simulation models, and is a basis for the development of a software environment that can automate the validation activity. This paper is concentrated on the pretreatment of the model validation. We use the validation scenarios and standard sequences generated by well-established SDG model to validate the trends fitted from the simulation model. The results are helpful to find potential problems, assess possible bugs in the simulation model and solve the problem effectively. A case study on a simulation model of boiler is presented to demonstrate the effectiveness of this method.
文摘Batch processes are important in chemical industry,in which operators usually play a major role and hazards may arise by their inadvertent acts.In this paper,based on hazard and operability study and concept of qualitative simulation,an automatic method for adverse consequence identification for potential maloperation is proposed.The qualitative model for production process is expressed by a novel directed graph.Possible operation deviations from normal operating procedure are identified systematically by using a group of guidewords.The proposed algorithm is used for qualitative simulation of batch processes to identify the effects of maloperations.The method is illustrated with a simple batch process and a batch reaction process.The results show that batch processes can be simulated qualitatively and hazards can be identified for operating procedures including maloperations.After analysis for possible plant maloperations,some measures can be taken to avoid maloperations or reduce losses resulted from maloperations.
基金Supported by National Natural Science Foundation of China (No.50709024)Program for New Century Excellent Talents in University (No. NCET-08-0391)
文摘Long tunnel excavation with tunnel boring ily affected by uncertainties and needs to be adjusted machine (TBM) is a complex and stochastic process. It is eas- according to specific geological conditions in different tunnel sections, which makes the construction scheduling and management difficult. Based on the rock mass classification, this paper estimates the penetration rate. Using the rate, a cyclic network simulation (CYCLONE) model of TBM boring system is established, and the advance rates under different geological conditions are determined. Then, the impact of different cutter head thrust, which is chosen in reasonable range according to previous experiences, on pro- ject schedule is analyzed. Moreover, the simulation model of mucking system is built to determine the number of muck trains and rail intersections reasonably, regarding the efficiency of muck loading and material transporting. Based on the interaction and interrelation between TBM boring system and mucking system, the combined CY- CLONE model for the entire tunneling process is established. Then reasonable construction schedule, the utilization rate of working resources, and the probability of project completion are obtained through the model programming. At last, a project application shows the feasibility of the presented method.