期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
多级A/O-MBR工艺对生活污水脱氮除磷的工艺研究 被引量:20
1
作者 许忠凤 戴海平 +1 位作者 孙磊 尹延梅 《水处理技术》 CAS CSCD 北大核心 2019年第11期117-121,126,共6页
针对传统A2/O工艺难以实现对生活污水高效脱氮除磷的问题,在传统的A2/O工艺的基础上,增加膜生物反应器,构建多级多段A/O-MBR工艺中试实验设备,考察该系统的反应级数和进水分配方式对生活污水脱氮除磷的影响。该系统分别以厌氧区单点进... 针对传统A2/O工艺难以实现对生活污水高效脱氮除磷的问题,在传统的A2/O工艺的基础上,增加膜生物反应器,构建多级多段A/O-MBR工艺中试实验设备,考察该系统的反应级数和进水分配方式对生活污水脱氮除磷的影响。该系统分别以厌氧区单点进水的三级A/O工艺、以50%、22.70%、18.30%和9%比例进水的四级A/O工艺和以55%、30%和15%比例进水的三级A/O工艺三种工艺运行,实验结果表明,当进水COD、TN、NH3-N和TP平均质量浓度分别为258.31、27.50、17.20、2.77 mg/L时,以55%、30%和15%比例进水的三级A/O工艺系统的水处理效果最好,其出水COD、NH3-N、TN和TP平均质量浓度是21.20、0.48、4.11、0.51 mg/L,平均去除率为90.26%、96.88%、81.88%和76.45%,出水COD和NH3-N质量浓度均达地表水环境质量标准(GB 3838-2002)Ⅳ类水体标准,出水TN浓度都达到城镇污水处理污染物排放标准(GB 18919-2002)一级A标准,出水TP中有64.29%达到一级A标准,各功能单元COD、NH3-N、TN和TP负荷分配合理,合理利用碳源。该多点进水三级A/O-MBR工艺实现了污水中碳源的有效利用和较低水处理成本。 展开更多
关键词 多级多段A/O-MBR工艺 脱氮除磷 污泥负荷 单点进水 多点
下载PDF
Investment decision optimization for delayed product differentiation based on queuing theory 被引量:2
2
作者 Fei Qingyi Kong Nan Zhao Lindu 《Journal of Southeast University(English Edition)》 EI CAS 2018年第4期532-539,共8页
To balance inventory cost with diverse demand,an optimal investment decision on necessary process improvement for delayed product differentiation is studied. A two-stage flexible manufacturing system is modeled as a c... To balance inventory cost with diverse demand,an optimal investment decision on necessary process improvement for delayed product differentiation is studied. A two-stage flexible manufacturing system is modeled as a continuous time Markov chain. The first production stage manufactures semifinished products based on a make-to-stock policy. The second production stage customizes semi-finished products from the first production stage on a make-to-order policy. Various performance measures for this flexible manufacturing system are evaluated by using matrix geometric methods. An optimization model to determine the level of investment on process improvement that minimizes the manufacturer ’s total cost is established. The results show that,a higher investment level can reduce both the expected customer order fulfillment delay and the expected semi-finished products inventory. When the initial order penetration point is 0. 4,the manufacturer ’s total cost is reduced by 15. 89% through process investment. In addition, the optimal investment level increases with the increase in the unit time cost of customer order fulfillment delay,and decreases with the increase in the product value and the initial order penetration point. 展开更多
关键词 flexible manufacturing system postponement strategy order penetration point investment process matrix geometric method
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部