期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
对天津市马路市场占路问题的思考
1
作者 冯国胜 《交通管理》 1998年第2期8-11,共4页
关键词 交通管理 市场占路 天津 马路市场
下载PDF
实施“畅通工程”,市场进厅见成效
2
作者 邹南昌 于冉冉 《城市交通》 2002年第1期23-25,共3页
自实施“畅通工程”以来,天津市区加快建设“厅内市场”的步伐,目前已共建成“厅内市场”203处。市政府在1998年确定用5-7年撤销原“占路市场”将提前实现。2002年,进入工作扫尾阶段,基本实现无“占路市场”的目标。对此消息,多个... 自实施“畅通工程”以来,天津市区加快建设“厅内市场”的步伐,目前已共建成“厅内市场”203处。市政府在1998年确定用5-7年撤销原“占路市场”将提前实现。2002年,进入工作扫尾阶段,基本实现无“占路市场”的目标。对此消息,多个新闻媒体报导,从中反映出市政府清理“马路市场”、“退场进厅”工作的决心、力度和效率,同时它也折射出进行该项工作的难度、规模和加强城市管理的意义。 展开更多
关键词 畅通工程 天津市 厅内市场 占路市场 城市管理 集贸市场
下载PDF
Aspects of Railway Capacity and Occupation Time Estimation
3
作者 Jozef Gasparik Vladislav Zitricky 《Journal of Civil Engineering and Architecture》 2014年第3期322-331,共10页
The priority of the EU transport policy in railway sector is to open up the railway market. The objective is to provide railway undertakings with access to the railway network on equal terms. The main problem is deter... The priority of the EU transport policy in railway sector is to open up the railway market. The objective is to provide railway undertakings with access to the railway network on equal terms. The main problem is determining the infrastructure capacity. A variety of methodologies are used across Europe for the capacity estimation of railway infrastructure. This diversity has forced railway infrastructure managers to seek a new, common methodology. The UIC methodology is an easy way to calculate the capacity consumption. However, there the possibility to expound this methodology in different ways, which can result in different capacity consumptions. There isan advantage to improve this methodology and to set a clear and unified method of occupation time estimation. The fundamental improvement to UIC methodology is the definition of the occupation time by the trains. This paper gives a description of Slovak and UIC methodologies as a basis for a newly developed approach. The new way of estimation of the capacity consumption (occupation time) is based on a graphic approach. The new methodology concerns the estimation of the infrastructure occupation time and is a conceptual framework developed by the authors for an easier evaluation of occupation time in train traffic diagrams. The new methodology makes the UIC methodology more usable and enables more exact results to be obtained from infrastructure capacity examination. 展开更多
关键词 Methodology for capacity estimation train traffic diagram occupation square occupation rate buffer time.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部