制备微流控器件通常是一个辛苦的过程:对于每一个器件的构建,都需要一个独特的模具或者模型。英国苏格兰市格拉斯哥大学(University of Glasgow)的Geoffrey J.T.Cooper和keroy Cronin采用一种更灵活的方法,即时控制自组装聚甲醛...制备微流控器件通常是一个辛苦的过程:对于每一个器件的构建,都需要一个独特的模具或者模型。英国苏格兰市格拉斯哥大学(University of Glasgow)的Geoffrey J.T.Cooper和keroy Cronin采用一种更灵活的方法,即时控制自组装聚甲醛(POM)微管的增长、方向和直径,从而迈出了设计制备微流控器件的第一步。展开更多
Considering the two-dimension(2 D) characteristic and the unknown optimal trajectory problem of the batch processes, an integrated model predictive control-iterative learning control(MPC-ILC) for batch processes is pr...Considering the two-dimension(2 D) characteristic and the unknown optimal trajectory problem of the batch processes, an integrated model predictive control-iterative learning control(MPC-ILC) for batch processes is proposed in this paper. Firstly, the batch-axis information and time-axis information are combined into one quadratic performance index. It implies the integration of ILC and MPC algorithm idea, which leads to superior tracking performance and better robustness against disturbance and uncertainty. To address the problem of the unknown optimal trajectory, both time-varying prediction horizon and end product quality control are employed. Moreover, an integrated 2 D just-in-time learning(JITL) model is used to improve the predictive accuracy. Furthermore, rigorous description and proof are presented to prove the convergence and tracking performance of the proposed MPC-ILC strategy. The simulation results show the effectiveness of the proposed method.展开更多
Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work constructio...Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.展开更多
文摘制备微流控器件通常是一个辛苦的过程:对于每一个器件的构建,都需要一个独特的模具或者模型。英国苏格兰市格拉斯哥大学(University of Glasgow)的Geoffrey J.T.Cooper和keroy Cronin采用一种更灵活的方法,即时控制自组装聚甲醛(POM)微管的增长、方向和直径,从而迈出了设计制备微流控器件的第一步。
基金Supported by the National Natural Science Foundation of China(61374044)Shanghai Science Technology Commission(15510722100,16111106300)Shanghai Municipal Education Commission(14ZZ088)
文摘Considering the two-dimension(2 D) characteristic and the unknown optimal trajectory problem of the batch processes, an integrated model predictive control-iterative learning control(MPC-ILC) for batch processes is proposed in this paper. Firstly, the batch-axis information and time-axis information are combined into one quadratic performance index. It implies the integration of ILC and MPC algorithm idea, which leads to superior tracking performance and better robustness against disturbance and uncertainty. To address the problem of the unknown optimal trajectory, both time-varying prediction horizon and end product quality control are employed. Moreover, an integrated 2 D just-in-time learning(JITL) model is used to improve the predictive accuracy. Furthermore, rigorous description and proof are presented to prove the convergence and tracking performance of the proposed MPC-ILC strategy. The simulation results show the effectiveness of the proposed method.
文摘Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.