An integrated model is presented to schedule the container handling system. The objective is to improve the coop- eration between different types of equipments, and to increase the productivity of the terminal. The pr...An integrated model is presented to schedule the container handling system. The objective is to improve the coop- eration between different types of equipments, and to increase the productivity of the terminal. The problem is formulated as a Hybrid Flow Shop Scheduling problem with precedence constraint, setup times and blocking (HFSS-B). A tabu search algorithm is proposed to solve this problem. The quality and efficiency of the proposed algorithm is analyzed from the computational point of view.展开更多
文摘An integrated model is presented to schedule the container handling system. The objective is to improve the coop- eration between different types of equipments, and to increase the productivity of the terminal. The problem is formulated as a Hybrid Flow Shop Scheduling problem with precedence constraint, setup times and blocking (HFSS-B). A tabu search algorithm is proposed to solve this problem. The quality and efficiency of the proposed algorithm is analyzed from the computational point of view.