期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
连续重整装置专有控制技术的实现和应用 被引量:1
1
作者 宋文华 王亮 《化工自动化及仪表》 CAS 2012年第9期1224-1226,共3页
针对炼油企业连续重整装置的专有控制技术,通过对汽轮机转速,压缩机高、低压缸防喘振阀,超压放空阀,入口分液罐,重整产物分离罐以及再生接触罐等设备的压力、流量多变量解耦控制,保证压缩机在不同工况下达到最优、最节能和最安全的工作... 针对炼油企业连续重整装置的专有控制技术,通过对汽轮机转速,压缩机高、低压缸防喘振阀,超压放空阀,入口分液罐,重整产物分离罐以及再生接触罐等设备的压力、流量多变量解耦控制,保证压缩机在不同工况下达到最优、最节能和最安全的工作状态。 展开更多
关键词 离心压缩机串联 连续重整装置 压力三分程
下载PDF
Numerical simulation of residual stress field in green power metallurgy compacts by modified Drucker-Prager Cap model 被引量:6
2
作者 周蕊 张连洪 +1 位作者 何柏岩 刘玉红 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2013年第8期2374-2382,共9页
Compaction process simulation and residual stress prediction of green PM compact were carried out with elasto-plastic 3D FEA based on the modified Drueker-Prager Cap model in Abaqus. The model parameters of the invest... Compaction process simulation and residual stress prediction of green PM compact were carried out with elasto-plastic 3D FEA based on the modified Drueker-Prager Cap model in Abaqus. The model parameters of the investigated powder Distaloy AE were determined as functions of relative density through typical mechanical property tests of powder. The model was implemented as a user subroutine USDFLD. Single sided compaction of a d20 ram^5 mm disk green compact of Distaloy AE was simulated, and the residual stress of the disk after ejection was predicted with FEA. The FEA results of the compaction process and the residual stress of the disk show good agreement with compaction experiments and X-ray diffraction measurements, which validates the model and its parameters. The results indicate that the compressive residual stresses exist mainly in a thin layer on the side surface, but the residual stresses are very small on the top and bottom surfaces. 展开更多
关键词 residual stress green compacts numerical simulation modified Drucker-Prager Cap model
下载PDF
Nonlinear dynamic analysis of the Three Gorge Project powerhouse excited by pressure fluctuation 被引量:4
3
作者 Cun-hui ZHANG Yun-liang ZHANG 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2009年第9期1231-1240,共10页
This study established a 3D finite element model for 15# hydropower house of the Three Gorges Project (TGP) and performed a nonlinear dynamic analysis under pressure fluctuation. In this numerical model, the stiffness... This study established a 3D finite element model for 15# hydropower house of the Three Gorges Project (TGP) and performed a nonlinear dynamic analysis under pressure fluctuation. In this numerical model, the stiffness degradation in tension for concrete was considered on the basis of the continuum isotropic damage theory. Natural vibration frequencies of the damaged and undamaged structures were compared after static water pressure was applied. Then a study was further conducted on forced vibration of the powerhouse with pre-existing damages under pressure fluctuation that acts on the flow passage; displacement, velocity and acceleration of the important structural members were afterwards presented and checked. Numerical results show that tensile damages in concrete surrounding the spiral case only exert significant impact upon the dynamic characteristics of substructure but show little effect on the superstructure. Nevertheless vibrations of the powerhouse are still under the recommended vibration limits. 展开更多
关键词 Three Gorges Project (TGP) Hydropower house Dynamic Nonlinear DAMAGE Pressure fluctuation
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部