期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
南方松木木片压力预处理后TMP制浆的工厂规模试验结果
1
《国际造纸》 2002年第5期60-60,共1页
关键词 松木木片 造纸 压力预处理 TMP制浆
下载PDF
Flow Pattern and Pressure Fluctuation of Severe Slugging in Pipeline-riser System 被引量:13
2
作者 罗小明 何利民 马华伟 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2011年第1期26-32,共7页
During the exploitation of offshore oil and gas,it is easy to form severe slugging which can cause great harm in the riser connecting wellheads and offshore platform preprocessing system.The flow pattern and pressure ... During the exploitation of offshore oil and gas,it is easy to form severe slugging which can cause great harm in the riser connecting wellheads and offshore platform preprocessing system.The flow pattern and pressure fluctuation of severe slugging were studied in an experimental simulation system with inner diameter of 0.051 m.It is found that severe slugging can be divided into three severe slugging regimes:regime I at low gas and liquid flow rates with large pressure fluctuation,intermittent flow of liquid and gas in the riser,and apparent cutoff of liquid phase,regime II at high gas flow rate with non-periodic fluctuation and discontinuous liquid outflow and no gas cutoff,regime III at high liquid flow rate with degenerative pressure fluctuation in form of relatively stable bubbly or plug flow.The results indicate that severe slugging still occurs when the declination angle of pipeline is 0,and there are mainly two kinds of regimes:regime I and regime II.As the angle increases,the formation ranges of regime I and regime III increase slightly while that of regime II is not affected.With the increase of gas superficial velocity and liquid superficial velocity,the pressure fluctuation at the bottom of riser increases initially and then decreases.The maximum value of pressure fluctuation occurs at the transition boundary of regimes I and II. 展开更多
关键词 multiphase flow severe slugging pipeline-riser system flow regime pressure fluctuation
下载PDF
Pressure leaching of bismuth sulfide concentrate containing molybdenum and tungsten in alkaline solution 被引量:3
3
作者 张杜超 杨天足 +1 位作者 刘伟锋 吴江华 《Journal of Central South University》 SCIE EI CAS 2012年第12期3390-3395,共6页
The leaching results of bismuth sulfide concentrate containing molybdenum and tungsten in air-H2O2-NaOH system, pressure-O2-Na2CO3 system and pressure-O2-NaOH system were investigated. The results show that the extrac... The leaching results of bismuth sulfide concentrate containing molybdenum and tungsten in air-H2O2-NaOH system, pressure-O2-Na2CO3 system and pressure-O2-NaOH system were investigated. The results show that the extraction of molybdenum, tungsten and sulfur goes up with the increase of NaOH concentration, oxygen partial pressure and reaction time. The extraction of molybdenum and tungsten also rises up with temperature, but the leaching ratio of sulfur increases initially to a peak of 98% at 150℃ and then decreases with the increase of temperature. Under the optimal conditions, the extraction of molybdenum, tungsten and sulfur is more than 95.6%, 93.8% and 96.0%, respectively, and the main phases of residue are Bi2O3 and Fe2O3. Therefore, the method of pressure leaching in alkaline solution is provided as an effective separation of molybdenum, tungsten and sulfur from bismuth and a beneficial pretreatment for consequent process. 展开更多
关键词 bismuth sulfide concentrate MOLYBDENUM TUNGSTEN pressure leaching sodium hydroxide
下载PDF
In-situ stress measurements and stress change monitoring to monitor overburden caving behaviour and hydraulic fracture pre-conditioning 被引量:6
4
作者 Puller Jesse W. Mills Ken W. +1 位作者 Jeffrey Rob G. Walker Rick J. 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第1期103-110,共8页
A coal mine in New South Wales is longwall mining 300 m wide panels at a depth of 160–180 m directly below a 16–20 m thick conglomerate strata. As part of a strategy to use hydraulic fracturing to manage potential w... A coal mine in New South Wales is longwall mining 300 m wide panels at a depth of 160–180 m directly below a 16–20 m thick conglomerate strata. As part of a strategy to use hydraulic fracturing to manage potential windblast and periodic caving hazards associated with these conglomerate strata,the in-situ stresses in the conglomerate were measured using ANZI strain cells and the overcoring method of stress relief. Changes in stress associated with abutment loading and placement of hydraulic fractures were also measured using ANZI strain cells installed from the surface and from underground. Overcore stress measurements have indicated that the vertical stress is the lowest principal stress so that hydraulic fractures placed ahead of mining form horizontally and so provide effective pre-conditioning to promote caving of the conglomerate strata. Monitoring of stress changes in the overburden strata during longwall retreat was undertaken at two different locations at the mine. The monitoring indicated stress changes were evident 150 m ahead of the longwall face and abutment loading reached a maximum increase of about7.5 MPa. The stresses ahead of mining change gradually with distance to the approaching longwall and in a direction consistent with the horizontal in-situ stresses. There was no evidence in the stress change monitoring results to indicate significant cyclical forward abutment loading ahead of the face. The forward abutment load determined from the stress change monitoring is consistent with the weight of overburden strata overhanging the goaf indicated by subsidence monitoring. 展开更多
关键词 Stress measurementOverburdenHydraulic fracturing Longwall
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部