In order to solve the problem of significant fluctuation of workload at each node, a new approach is proposed for acquisition of load parameter for Now, a network of heterogeneous computational resource. The current m...In order to solve the problem of significant fluctuation of workload at each node, a new approach is proposed for acquisition of load parameter for Now, a network of heterogeneous computational resource. The current methods in use for acquisition of workload are reviewed for comparison and the implemention of prediction model is described in detail. It is concluded from the analysis of experimental results that the prediction method takes less time and has better predictability, and it gives a beneficial support to task scheduling and dynamic load balance.展开更多
Accurate detection and picking of the P-phase onset time in noisy microseismic data from underground mines remains a big challenge. Reliable P-phase onset time picking is necessary for accurate source location needed ...Accurate detection and picking of the P-phase onset time in noisy microseismic data from underground mines remains a big challenge. Reliable P-phase onset time picking is necessary for accurate source location needed for planning and rescue operations in the event of failures. In this paper, a new technique based on the discrete stationary wavelet transform (DSWT)and higher order statist!cs, is proposed for processing noisy data from underground mines. The objectives of this method are to (1) Improve manual detection and tPicking of P-phase onset; and (ii) provide an automatic means of detecting and picking P-phase onset me accurately. The DSWT is first used to filter the signal over several scales. The manual P-phase onset detection and picking are then obtained by computing the signal energy across selected scales with frequency bands that capture the signal of interest. The automatic P-phase onset, on the other hand, is achieved by using skewness- and kurtosis-based criterion applied to selected scales in a time-frequency domain. The method was tested using synthetic and field data from an underground limestone mine. Results were compared with results obtained by using the short-term to long-term average (STA/LTA) ratio and that by Reference Ge et al. (2009). The results show that the me!hod provides a more reliable estimate of the P-phase onset arrival than the STA]LTA method when the signal to noise ratio is very low. Also, the results obtained from the field data matched accurately with the results from Reference Ge et al. (2009).展开更多
文摘In order to solve the problem of significant fluctuation of workload at each node, a new approach is proposed for acquisition of load parameter for Now, a network of heterogeneous computational resource. The current methods in use for acquisition of workload are reviewed for comparison and the implemention of prediction model is described in detail. It is concluded from the analysis of experimental results that the prediction method takes less time and has better predictability, and it gives a beneficial support to task scheduling and dynamic load balance.
文摘Accurate detection and picking of the P-phase onset time in noisy microseismic data from underground mines remains a big challenge. Reliable P-phase onset time picking is necessary for accurate source location needed for planning and rescue operations in the event of failures. In this paper, a new technique based on the discrete stationary wavelet transform (DSWT)and higher order statist!cs, is proposed for processing noisy data from underground mines. The objectives of this method are to (1) Improve manual detection and tPicking of P-phase onset; and (ii) provide an automatic means of detecting and picking P-phase onset me accurately. The DSWT is first used to filter the signal over several scales. The manual P-phase onset detection and picking are then obtained by computing the signal energy across selected scales with frequency bands that capture the signal of interest. The automatic P-phase onset, on the other hand, is achieved by using skewness- and kurtosis-based criterion applied to selected scales in a time-frequency domain. The method was tested using synthetic and field data from an underground limestone mine. Results were compared with results obtained by using the short-term to long-term average (STA/LTA) ratio and that by Reference Ge et al. (2009). The results show that the me!hod provides a more reliable estimate of the P-phase onset arrival than the STA]LTA method when the signal to noise ratio is very low. Also, the results obtained from the field data matched accurately with the results from Reference Ge et al. (2009).