期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
塔机双平桥及升降机在超大型间冷塔施工中的联合应用 被引量:1
1
作者 程虎 张卫星 邢新华 《建筑机械》 2020年第6期52-54,共3页
内蒙古神华胜利电厂2×660MW机组新建间冷塔工程采用高度集约设计,主要特点为"五塔合一",设计高度为225m,国内外尚无同设计参数工程建设,堪称"世界之最"。如何在有效保障工程安全性前提下利用塔机双平桥、升降... 内蒙古神华胜利电厂2×660MW机组新建间冷塔工程采用高度集约设计,主要特点为"五塔合一",设计高度为225m,国内外尚无同设计参数工程建设,堪称"世界之最"。如何在有效保障工程安全性前提下利用塔机双平桥、升降机实施大运输量、超高空、密集交叉等环境下的垂直运输机械布置、安拆及使用等,目前国内暂无成熟经验可借鉴。中国能源建设集团安徽电力建设第二工程有限公司(烟塔施工技术研究所)通过多种技术运用对传统施工技术进行优化及重新设计,在神华胜利电厂225m间冷塔筒壁施工中进行了实践性运用,取得良好效果。 展开更多
关键词 塔机 双平桥 升降机 超大型间冷塔 应用
下载PDF
General design of Sutong Bridge 被引量:4
2
作者 Zhang Xigang Yuan Hong +2 位作者 Pei Minshan Dai Jie Xu Lin 《Engineering Sciences》 EI 2009年第1期6-11,共6页
The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused... The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused by severe meteorological conditions,perplexing hydrological conditions,deep buried bedrock and higher navigation level,many new technics and methods were created.Keys including structural system,steel box girder,stayed cable,tower,pier,tower foundation,collision avoidance system,wind-resistance,seismic-resistance,structural nonlinear response and structural static stability were presented individually in this paper. 展开更多
关键词 cable-stayed bridge structural system steel box girder stayed cable TOWER tower foundation
下载PDF
High-precision inductance measurement system based on double-excitation auto-balancing bridge
3
作者 AI Yu FU Xiao +3 位作者 LI Yao WANG Xianquan DUAN Fajie JIANG Jiajia 《Journal of Measurement Science and Instrumentation》 CAS CSCD 2022年第3期253-260,共8页
In order to achieve high precision measurement of inductance in a wide frequency range,a method of inductance measurement based on double-excitation auto-balancing bridge is proposed.In this method,the direct digital ... In order to achieve high precision measurement of inductance in a wide frequency range,a method of inductance measurement based on double-excitation auto-balancing bridge is proposed.In this method,the direct digital synthesizer(DDS)as signal generator is used as the bridge excitation source,and the bridge is automatically balanced by adjusting and measuring the voltage ratio.Using standard resistors,the system can achieve high precision measurement of four-terminal pair inductors in the frequency range of 100Hz-100kHz.Aiming at the low efficiency of bridge balancing,an iterative balancing algorithm based on the steepest descent method is proposed.In order to suppress the interference caused by the initial phase change and non-integer periodic sampling,the high-precision measurement of the complex impedance of inductance is realized based on the all-phase fast Fourier transform(apFFT).Finally,the corresponding measurement system is built and the inductance measurement experiment is carried out.The experimental results show that the relative error of the system for inductance measurement can be as low as 0.009%,and the optimal relative measurement uncertainty of the system can reach 9.89×10^(-4)compared with 5×10^(-5)of commercial impedance analyzer. 展开更多
关键词 double-excitation auto-balancing bridge inductance measurement all-phase fast Fourier transform(apFFT) relative measurement uncertainty
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部