拉西瓦水电站双曲混凝土拱坝泄洪底孔一期钢衬安装
1
作者 何育鹏 《科技资讯》 2010年第33期93-93,95,共2页
由于拉西瓦水电站底孔钢衬安装孔内施工受作业场地狭小、施工干扰大、起吊设备单一等条件的限制,采取底孔事故门和工作弧门一期底钢衬分别一次性同时安装的方案,以便整体测量、调整。侧钢衬在缆机起吊重量范围内分加工厂后方组合,在作... 由于拉西瓦水电站底孔钢衬安装孔内施工受作业场地狭小、施工干扰大、起吊设备单一等条件的限制,采取底孔事故门和工作弧门一期底钢衬分别一次性同时安装的方案,以便整体测量、调整。侧钢衬在缆机起吊重量范围内分加工厂后方组合,在作业现场分层安装的方法,在实际施工中取得了良好的效果。 展开更多
关键词 双曲混凝土拱坝 底孔 钢衬 安装
下载PDF
立洲水电站25t固定式走索施工技术
2
作者 张进 李荣果 王强 《四川水力发电》 2010年第A01期54-56,60,共4页
立洲水电站大坝25 t固定式走索布置在大坝坝肩高程2 240 m,坝肩两岸边坡陡峭,右岸无机械施工通道。走索安装过程中,采用了自行设计改装的大件运输车,解决了26 t大件的便道运输问题,自行设计的龙门架解决了20多m高的垂直运输问题。该走... 立洲水电站大坝25 t固定式走索布置在大坝坝肩高程2 240 m,坝肩两岸边坡陡峭,右岸无机械施工通道。走索安装过程中,采用了自行设计改装的大件运输车,解决了26 t大件的便道运输问题,自行设计的龙门架解决了20多m高的垂直运输问题。该走索的安装为今后复杂条件下的同类工程施工提供了参考经验。 展开更多
关键词 立洲水电站 双曲碾压混凝土拱坝 25t固定式走索 龙门架
下载PDF
Seismic Deformation and Seismic Resistance Analysis of Shapai Roller Compacted Concrete Arch Dam Based on Field Monitoring and Dynamic Finite Element Method 被引量:2
3
作者 ZHUO Li HE Jiang-da XIE Hong-qiang 《Journal of Mountain Science》 SCIE CSCD 2013年第1期137-148,共12页
Shapai Roller Compacted Concrete(RCC) Arch Dam is the highest RCC arch dam of the 20th century in the world with a maximum height of 132m,and it is the only concrete arch dam near the epicentre of Wenchuan earthquake ... Shapai Roller Compacted Concrete(RCC) Arch Dam is the highest RCC arch dam of the 20th century in the world with a maximum height of 132m,and it is the only concrete arch dam near the epicentre of Wenchuan earthquake on May 12th,2008.The seismic damage to the dam and the resistance of the dam has drawn great attention.This paper analyzed the response and resistance of the dam to the seismic wave using numerical simulations with comparison to the monitored data.The field investigation after the earthquake and analysis of insitu data record showed that there was only little variation in the opening size at the dam and foundation interface,transverse joints and inducing joints before and after the earthquake.The overall stability of the dam abutment resistance body was quite good except a little relaxation was observed.The results of the dynamic finite element method(FEM) showed that the sizes of the openings obtained from the numerical modeling are comparable with the monitored values,and the change of the opening size is in millimeter range.This study revealed that Shapai arch dam exhibited high seismic resistance and overload capacity in the Wenchuan earthquake event.The comparison of the monitored and simulated results showed that the numerical method applied in this paper well simulated the seismic response of the dam.The method could be useful in the future application on the safety evaluation of RCC dams. 展开更多
关键词 Deformation monitoring Nonlinear dynamic finite element analysis RCC arch dam Wenchuan earthquake Power station
下载PDF
某小(Ⅱ)型水库渗漏情况分析及除险加固 被引量:1
4
作者 白毓婷 《湖南水利水电》 2018年第3期22-24,共3页
某小(Ⅱ)型浆砌石拱坝水库建成蓄水后,坝体出现渗漏并伴有碳酸钙淋漓现象。文章对工程作了简单介绍,对其坝体渗漏情况及成因进行分析,并提出了防渗加固处理的两种方案,通过方案对比,确定最优方案。并指出新型材料应用的优点及适用范围。
关键词 混凝土砌块石双曲拱坝 渗漏 成因 加固
下载PDF