The RF system for the Beijing Electron Positron Collider Upgrade(BEPCⅡ)Project had been working since Nov,2006.It consists of 3 subsystems including the superconducting cavity,the klystron and the low level RF system...The RF system for the Beijing Electron Positron Collider Upgrade(BEPCⅡ)Project had been working since Nov,2006.It consists of 3 subsystems including the superconducting cavity,the klystron and the low level RF system.Compared with the former RF system,the operating frequency has been changed from 200MHz to 499.8MHz, and the superconducting cavity has been used to replace the normal cavity.Up to now,the RF system performance is good and achieves the designed target.展开更多
Reliable connection of turbine generators in complex main wiring structures to the power grid through a plurality of switches is a new key problem,referred to as multipoint automatic synchronization(MPAS),in automatic...Reliable connection of turbine generators in complex main wiring structures to the power grid through a plurality of switches is a new key problem,referred to as multipoint automatic synchronization(MPAS),in automatic control systems(ACS).In this paper,different methods of voltage-frequency and phase-difference control are analyzed,and a control methodology based on active frequency tracking(AFT)is presented.Through the establishment of the multi-point automatic synchronization model and the analysis of the governor transfer function with this control method,the important control parameters and automatic process control sequence are summarized.The correctness and effectiveness of the designed methodology are inspected through on-site testing,and the importance of the function and selection of parameters are also explored.展开更多
文摘The RF system for the Beijing Electron Positron Collider Upgrade(BEPCⅡ)Project had been working since Nov,2006.It consists of 3 subsystems including the superconducting cavity,the klystron and the low level RF system.Compared with the former RF system,the operating frequency has been changed from 200MHz to 499.8MHz, and the superconducting cavity has been used to replace the normal cavity.Up to now,the RF system performance is good and achieves the designed target.
文摘Reliable connection of turbine generators in complex main wiring structures to the power grid through a plurality of switches is a new key problem,referred to as multipoint automatic synchronization(MPAS),in automatic control systems(ACS).In this paper,different methods of voltage-frequency and phase-difference control are analyzed,and a control methodology based on active frequency tracking(AFT)is presented.Through the establishment of the multi-point automatic synchronization model and the analysis of the governor transfer function with this control method,the important control parameters and automatic process control sequence are summarized.The correctness and effectiveness of the designed methodology are inspected through on-site testing,and the importance of the function and selection of parameters are also explored.